This appendix describes the requirements to validate under transient conditions the functionality of the installed PEMS as well as the correctness of the exhaust mass flow rate obtained from non-traceable exhaust mass flow meters or calculated from ECU signals.
a0 | — | y intercept of the regression line
a1 | — | slope of the regression line
r2 | — | coefficient of determination
x | — | actual value of the reference signal
y | — | actual value of the signal under validation
It is recommended to validate the correct installation of a PEMS on a vehicle via comparison with laboratory installed equipment on a test performed on a chassis dynamometer either before the RDE test or, alternatively, after the completion of the test. For tests performed during type approval, the validation test is required.
The PEMS shall be installed and prepared according to the requirements of Appendix 4. The PEMS installation shall be kept unchanged in the time period between the validation and the RDE test.
The validation test shall be conducted on a chassis dynamometer, as far as possible, under type approval conditions by following the requirements of UN Regulation No 154. It is recommended to feed the exhaust flow extracted by the PEMS during the validation test back to the CVS. If this is not feasible, the CVS results shall be corrected for the extracted exhaust mass. If the exhaust mass flow rate is validated with an exhaust mass flow meter, it is recommended to cross-check the mass flow rate measurements with data obtained from a sensor or the ECU.
The total distance-specific emissions [g/km] measured with laboratory equipment shall be calculated in accordance with UN Regulation No 154. The emissions as measured with the PEMS shall be calculated according to Appendix 7, summed to give the total mass of pollutants [g] and then divided by the test distance [km] as obtained from the chassis dynamometer. The total distance-specific mass of pollutants [g/km], as determined by the PEMS and the reference laboratory system, shall be evaluated against the requirements specified in paragraph 3.3. For the validation of NOX emission measurements, humidity correction shall be applied in accordance with UN Regulation No 154.
The PEMS validation results shall fulfil the requirements given in Table A6/1. If any permissible tolerance is not met, corrective action shall be taken and the PEMS validation shall be repeated.
[Only applicable if vehicle speed is determined by the ECU; to meet the permissible tolerance it is permitted to adjust the ECU vehicle speed measurements based on the outcome of the validation test.] [Parameter only mandatory if measurement required for compliance with the limits.] [PMP system.]
Parameter [Unit] | Permissible absolute tolerance
Distance [km] | 250 m of the laboratory reference
THC [mg/km] | 15 mg/km or 15 % of the laboratory reference, whichever is larger
CH4 [mg/km] | 15 mg/km or 15 % of the laboratory reference, whichever is larger
NMHC [mg/km] | 20 mg/km or 20 % of the laboratory reference, whichever is larger
PN [#/km] | 8•1010 p/km or 42 % of the laboratory reference whichever is larger
CO [mg/km] | 100 mg/km or 15 % of the laboratory reference, whichever is larger
CO2 [g/km] | 10 g/km or 7,5 % of the laboratory reference, whichever is larger
NOx [mg/km] | 10 mg/km or 12,5 % of the laboratory reference, whichever is larger
In addition to fulfilling the linearity requirements of paragraph 3. of Appendix 5 under steady-state conditions, the linearity of non-traceable exhaust mass flow meters or the exhaust mass flow rate calculated from non-traceable sensors or ECU signals shall be validated under transient conditions for each test vehicle against a calibrated exhaust mass flow meter or the CVS.
The validation shall be conducted on a chassis dynamometer under type approval conditions, as far as applicable on the same vehicle used for the RDE test. As reference, a flow meter with traceable calibration shall be used. The ambient temperature can be any within the range specified in paragraph 5.1. of this Annex. The installation of the exhaust mass flow meter and the execution of the test shall fulfil the requirement of paragraph 3.4.3. of Appendix 4.
The following calculation steps shall be taken to validate the linearity:
The signal under validation and the reference signal shall be time corrected by following, as far as applicable, the requirements of paragraph 3. of Appendix 7.
Points below 10 % of the maximum flow value shall be excluded from the further analysis.
At a constant frequency of at least 1.0 Hz, the signal under validation and the reference signal shall be correlated using the best-fit equation having the form:
ya1x a0
where:
y | | is the actual value of the signal under validation
a1 | | is the slope of the regression line
x | | is the actual value of the reference signal
a0 | | is the y intercept of the regression line
The standard error of estimate (SEE) of y on x and the coefficient of determination (r2) shall be calculated for each measurement parameter and system.
The linear regression parameters shall meet the requirements specified in Table A6/2.
The linearity requirements given in Table A6/2 shall be fulfilled. If any permissible tolerance is not met, corrective action shall be taken and the validation shall be repeated.
Measurement parameter/system | a0 | Slope a1 | Standard error of the estimate SEE |
Coefficient of determination
r2
Exhaust mass flow | 0,0 ± 3,0 kg/h | 1,00 ± 0,075 | ≤ 10 % max | ≥ 0,90