4.36. The UNHCR's 1994 programme (1,8 Mio ECU), which overlapped with that of other agencies (UNICEF), had to be recast on several occasions, owing to the resurgence of the war in Angola. A large part of the distribution of supplies and foodstuffs had been subcontracted to three NGOs which were operating in difficult areas - circumstances where particularly close follow-up appeared advisable. The work programme finally came to a halt part way through; it had not been possible to distribute a sizeable proportion of the supplies and the operations which had started did not have any lasting effect in two of the three provinces concerned. A large part of the funds paid to one of the NGOs had been used to refurbish three of its offices. The local ECHO agent had not monitored the operation in any way.
4.37. At the time of the Court's mission on the spot in 1994 and 1995, the role of ECHO's technical assistants needed clarification. Even in Zagreb and Belgrade the assistants had not been told how far they should go in seeking information and monitoring the partners, particularly the UN agencies. Their roles were not defined in the operational contracts with the partners, and their own terms of reference were general. They were not always consulted on new contracts arranged between the headquarters of the NGOs and the Commission, and sometimes were not even sent the contract until they requested it from Brussels. In addition, when ECHO was established, the previous practice was dropped whereby delegations were required to give short evaluations of the performance of a partner before final payments.
4.38. In March and June 1995, ECHO organized seminars in Nairobi and Moscow respectively for the technical assistants to address these issues, following which steps were taken to improve their terms of reference, working methods and reporting procedures. Together with measures being taken to improve contractual arrangements and the management of such technical assistants, these matters are being dealt with progressively.
4.39. The Commission should make more realistic evaluations of its requirements for technical assistants. In Serbia one technical assistant was responsible for monitoring ten NGOs and about 20 projects covering five sectors. Consultants engaged by ECHO to examine actions monitored by ECHO's technical assistants in Nairobi and in Azerbaijan pointed out that it was impossible for these technical assistants to do all that they needed to do.