, Special Report No 3/97 concerning the decentralized system for the implementation of the…

In forcesince 19 Mar 1997

4.29. The need to evaluate the use of PHARE funds is another aspect of management transparency. The evaluation of programme results is particularly important in a system of decentralized procedures over which the Commission has no day-to-day control. Without reliable evidence of how far programmes are achieving their objectives it is not possible to know whether funds have been used properly. The Commission should, therefore, introduce procedures which ensure that the management of budget funds is sound (31).

4.30. In many respects evaluation of the PHARE programme is difficult, in that it is based on the transfer of know-how rather than, for example, infrastructure projects, where results are more readily identifiable and quantifiable. On the other hand, the necessity of checking whether funds have been correctly applied is much greater, because of the intangibility of PHARE outputs. At the end of 1995, six years after the start of the PHARE programme, the Commission was still only at the stage of setting up an evaluation system that could show how well PHARE funds had been used (32).

4.31. DG IA's neglect of the evaluation function is surprising, given the increased importance attached to this aspect since the end of the 1980s by DG VIII, which is the DG responsible for the European Development Funds. The unit responsible for evaluation has been considerably strengthened by its adoption of the so-called 'logical framework` method and systematic conduct of mid-term reviews and ex-post evaluations for all new programmes. This is another instance where PHARE could have taken advantage of expertise and techniques already developed by other sections of the Commission working in related areas.

4.32. From 1991 onwards financing agreements have included an annex setting out the 'logical framework` method, which was intended to facilitate evaluation by integrating the planning, monitoring and evaluation phases of the project cycle. From the 1993 programmes onwards, a detailed logical framework matrix has formed an important part of the strategic plan which the manual requires PMUs to draw up at the beginning of a programme. In the same context the manual also requires PMUs to draw up 'monitoring and assessment reports` which were designed to provide an annual overview of each programme's performance and achievements and to form the basis for revision of the strategic plan each year.