There are currently more than 40 000 sewage plants in operation in the Member States (see Table 6 of the Technical annex). Although the statistics that are available in this area are not homogeneous and, therefore, difficult to use, the Court has estimated that almost 30 % of the plants built before 1992 ought to be upgraded. In the case of Belgium and Italy almost half the existing plants are likewise in need of upgrading (15). In the case of Member States that have not yet defined sensitive areas (where plants must be of the tertiary treatment type) the figures for such plants should probably be higher.
According to the available data (see Table 7 of the Technical annex), the percentage of the population served by sewage plants in 1990 was, on average, 69 % (Eurostat data), ranging from 10 % (Greece) to 98 % (Denmark). Taking into account the information given in the preceding paragraph and the fact that many small municipalities do not yet have sewage plants, it can be estimated that around 40 000 plants will need to be built or renewed by the end of 2005.
In addition there are a large number of projects for the construction of sewerage systems. As can be seen in Table 8 of the Technical annex, the average level of connection to sewage systems in the Member States in 1994 was around 76 %. Even though the Directive does not specify time limits for connection to such systems, it is obvious that the connections must be completed before the end of 2005 if plants are to comply with the Directive. The works involved in providing connections and collection systems are sometimes difficult and are also subject to delay, since most of the work takes place in urban areas.
In all the Member States where the Court carried out audits the authorities confirmed the possibility of their being unable to fulfil their statutory obligation (to construct sewage plants) within the specified time frame, especially in the case of the 'small` agglomerations which are also confronted with the problem of financing the investment. If the construction work is speeded up in order to meet these deadlines there is a risk that the quality of the work may suffer. In the Court's opinion the Commission should have given this matter closer consideration, long before the implementation deadlines specified in the Directive.
Nitrates Directive