The problems of stormwater and industrial waste water
Drainage projects must take into account the problems posed by stormwater in waste water collection and treatment. In simple collection systems in areas subject to flooding rises in water level at times of heavy rain may result in drains overflowing and sewage plant malfunction, as well as causing substantial pollution of the aquatic environment.
Legislation in France only requires collection systems to provide for the waste water that is produced during dry weather and leaves local authorities to determine the flow of pollution that will be brought by wet weather and to decide on the collection and treatment systems, having due regard to cost effectiveness. For example, the project for transferring effluent to La Marana treatment plant (OP Envireg-STRIDE 1990-93), did not provide separate drains for sewage and stormwater, because of budgetary constraints, despite the fact that the Biguglia local authority is in an area that is subject to periodic flooding (with the highway acting as a barrier and preventing stormwater from draining away). In consequence the stormwater is led away via ditches to the Biguglia lagoon and remains untreated.
Almost all the projects audited by the Court in Spain were prone to problems caused by the absence of separate storm drains: overflowing sewage, pollution and operating problems at sewage treatment plants. The drainage systems inspected by the Court in Portugal were also of the combined type.
However, as the Court found in Germany, some sewerage systems had separate storm drains (on the outskirts of towns), as well as the combined type, which were mainly in town centres.