, Special Report No 3/98 concerning the implementation by the Commission of EU policy and…

In forcesince 19 Mar 1998
101.

The cases that have been mentioned illustrate the many complex factors that need to be combined in order to obtain satisfactory results in terms of the quality of treatment plants, thus ensuring that Community funds are used in the optimum way. Community funds undoubtedly play a very important role in the implementation of any policy in this area. As regards the principle of shared responsibility, the Member States must ensure that the efficiency of these plants is maintained. The most important aspects, such as plant operation, network maintenance and the associated costs, were also examined more closely in some of the Member States.

The Envireg Initiative

102.

The Commission launched the Envireg CI in 1990, as a contribution to environmental protection and a means of promoting economic development. The specific objectives included the following:

–

to reduce pollution of coastal areas,

–

to promote the planning of land use in coastal areas,

–

to contribute to the better management and control of industrial waste,

–

to strengthen knowhow relating to the design and management of facilities for reducing pollution.

103.

The total contribution from the Structural Funds to the Envireg CI for the period 1990-93 was approximately 500 Mio ECU (at 1990 prices). The eligible areas were the coastal areas of Objective 1 regions and the coastal areas of the Objectives 2 and 5 (b) regions along the Mediterranean. In the case of industrial waste and technical assistance all Objective 1 regions were eligible.

104.

Almost two thirds of the appropriations were used to reduce pollution in Objective 1 coastal areas, notably via the construction or modernisation of sewage treatment plant and infrastructure. For this reason the Court audited the use of ERDF appropriations in Objective 1 regions for water quality improvement projects, the technical assistance network set up by the Commission to strengthen knowhow and the exchange of experience, and the ex post facto assessment of the Envireg CI.

Problems of implementing the Envireg Community initiative