The entire works programme requires advanced logistics, and problems arising in part of the works or part of the terminal can have an impact on the programme as a whole. It is clear, following the Commission's visit in connection with this exemption on 20 October 1999, that the entire operation of the airport is affected by these works and that all the space left free by the works on the apron has been used to build temporary structures in order to provide basic services to carriers and their passengers. In addition to departure modules D and E, structures facilitating the arrival of passengers and their baggage have been added, in particular at point A, at the request of carriers. Baggage transfer is effected in large part by vehicles with integral conveyor belts which nose onto the baggage reclaim belts alongside the terminal building. These vehicles are large and heavy, but they reduce the congestion of roadways and unloading areas caused by conventional trolleys.
Recital 46, Decision_act (EU) 2000/122
In forcesince 5 Jan 2000