Work on pier B, on the other hand, is scheduled to finish in June 2001. These are major works concerning most of the airport. Pier B had to be completely demolished, along with a large part of the corresponding terminal. This pier and the central part of the terminal will be completely rebuilt, the terminal being enlarged, the pier widened along its entire length, and an extra level added in order to accommodate Schengen and non-Schengen passenger flows. Although the fire occurred in 1996, the time required for insurance assessments, project studies and demolition works have resulted, three years later, in a situation which is still temporary and which causes considerable disruption both to passenger access to gate lounges and to the transport of groundhandling equipment across the apron. The use of numerous gate parking positions as remote positions obliges the airport to make a large number of bus transfers. Additional baggage transport equipment was also needed, which affected traffic and parking. The multiplication of equipment and the need to divert around the works area each time equipment is moved causes traffic problems in the vicinity of the terminal. Moreover, in this part of the airport, all available space is fully used, in particular in the two temporary departure modules (D and E).