As the establishment of local suppliers in the region progressed and the share of local content of materials increased, the cost disavantage of Mosel I associated with CKD production has been diminishing since 1992. The introduction of the Golf A3 in July 1992, the body of which is being assembled at the adjacent Mosel II factory, has given a further impetus to local suppliers. And yet, the component logistics were only transferred from Wolfsburg to Mosel in January 1993. At the beginning of 1993 a share of local supply of 36,5 % had been reached and productivity as well as value-added in the plant had risen significantly, so that it can be considered to have become a well-established FBU plant by that time. Furthermore, from 1993 onwards, Mosel I has been capable of producing at full capacity. Consequently, a crucial objective of the restructuring plan was achieved by the beginning of 1993, while the restructuring process will have terminated completely by the end of 1993, as originally planned. As a result, it can be expected that production at Mosel I will be economically viable and profitable by the end of 1994, as shown by the financial projections presented to the Commission. The Commission is therefore satisfied that there is a true link between the proposed aid and the restructuring plan, which appears to have a solid basis.
The rationale behind the interim project was to maintain and train a workforce for automobile production at the location until the new plant Mosel II comes on stream, as well as to absorb additional demand for Western-style cars in the East German and Eastern European market. The plant has created 700 jobs and saved another 1 250 in an area suffering from low productivity and high unemployment. With regard to the difficult social consequences that a closure of the plant would entail for the region, and the aim of socio-economic cohesion, the Commission agrees with the German Government that keeping Mosel I in business is in the best interest of the Community.