, Decision_act (EU) 1994/1068

In force

The Commission appreciates that in the early years of operation, the only possible mode of production at the plant has been the assembly of SKD and CKD kits, which was a priori uneconomic when compared with standard FBU production. This certainly applies to the production of Polos and the Golf A2 until July 1992. It therefore led to losses resulting from the uneconomic way in which production was organized from the beginning. For both models the car bodies could not be assembled on site. The Polo bodies were assembled and painted in Wolfsburg and then shipped to Mosel. Golf A 2 bodies were assembled at SAZ in Zwickau and painted first in Ingolstadt, and later in the new paint shop of Mosel I. Since final assembly for all of them took place in Mosel I, the resultant transport and logistics needs rendered this production mode highly inefficient. Body-in-white assembly in the old SAZ plant in Zwickau was done in a very labour-intensive way, while the resultant losses were transferred through pricing arrangements to SAB. On the other hand, the CKD production mode implied the shipping of complete component sets from Wolfsburg to Mosel. This was necessary because of the absence of local suppliers in the new Laender that could deliver just-in-time and because of the absence of logistics capabilities in terms of modern warehouse facilities, quality control equipment, hard- and software and a workforce trained for supplier logistics on-site that could handle direct deliveries from suppliers. This shipment involved additional costs at Wolfsburg for packaging, unpacking, quality control, administration and transport. Given these two important cost penalties, no private investor would have undertaken such an arrangement on such a scale and for such a long time, the main reason for which was to safeguard jobs in the region.