For the avoidance of doubt, it should be clearly identifiable whether an offshore wind farm connected to the KF system still constitutes one of the initial wind farms or not. Thus, a condition should be added in any event that from the date on which any of the three wind farms stops operating other than for usual maintenance or repairs with a limited duration, or becomes subject to significant modifications, which shall be deemed to be the case at least where a new connection agreement is required or where the generation capacity of the wind farm is increased by more than 5 %, production from this wind farm shall no longer be deducted from the total transmission capacity, before calculating the residual capacity, thereby increasing the available capacity for trade on the interconnector.
87 5. ASSESSMENT › 5.5. Limitation of the derogation in time and conditions aiming to increase competition and integration with the internal market for electricity › 5.5.1. Limitation in time, Decision_act (EU) 2020/2123