42 5. ASSESSMENT › 5.2. Substantial problem for the operation of the system › 5.2.2. The KF system as a first of its kind, Decision_act (EU) 2020/2123

In forcesince 11 Nov 2020

However, the first of its kind nature brought with it the need to change the configuration of the system in the middle of the project. Initially it was planned to use HVDC cables but, as the planned HVDC offshore platform became about 250 % more expensive than expected [Presentation by 50Hertz to the European Commission on 9 May 2014, slide 3.], the system had to be redesigned using offshore AC cables. A revised grant agreement was signed in September 2015.