The 2010 grant application for the KF project [P. 16, risk 7.] set out that a ‘correct interpretation of priority feed-in’ needed to be found to ensure viability of the project. The joint feasibility study, which was submitted to the Commission services, stated that the ‘basic assumption is that capacity on the interconnections not expected to be required for transporting wind energy can be made available to the spot market’. The expected additional transmission capacity for trade was thus only the capacity remaining after transporting the offshore wind production to shore.