43 5. ASSESSMENT › 5.2. Substantial problem for the operation of the system › 5.2.2. The KF system as a first of its kind, Decision_act (EU) 2020/2123

In forcesince 11 Nov 2020

This revised structure resulted in a significant reduction of the transmission capacity additional to what is needed to transmit the wind generated by the offshore wind farms to shore. This can be demonstrated by comparing two examples on congestion management given in different presentations by Energinet.dk to the Commission, on 14 November 2012 and 3 September 2014 respectively: