47 5. ASSESSMENT › 5.2. Substantial problem for the operation of the system › 5.2.2. The KF system as a first of its kind, Decision_act (EU) 2020/2123

In forcesince 11 Nov 2020

By way of example: In situations where the price in the DE/LU zone is higher than the price in the DK2 zone, the connection cable between the German wind farms and the German shore would be congested and ensuring a minimum trade volume on this cable would require countertrading in the direction DE/LU towards DK. If, in such a situation, at least 70 % of the 400 MW capacity (thus 280 MW) would need to be made available for trade, this capacity would be used for flowing electricity from the DK 2 zone (perhaps from wind generation in Denmark or other Scandinavian countries) to the DE/LU zone. However, the addition of the 280 MW and the wind from the Baltic 1 and Baltic 2 wind farms, which are located in the DE/LU bidding zone, would exceed the capacity of the connection cable between those wind farms and the German shore.