Those examples show that, assuming equal wind output in both scenarios, the capacity of the KF system made available to the market for trade towards Germany was 830 MW in the 2012 project and 230 MW in the 2014 project. It should be noted however that the effective difference between both project set-ups strongly depends on the wind situation [Based on the information provided by German and Danish authorities on 11 September 2020, the capacity values compare as follows: In case of the German and the Danish OWFs each having the same utilisation rate, the transmission capacity available to the market towards Germany would have varied under the initial project set-up from 600 MW (in case of no wind power production) to ~ 855 MW (in case of wind power productions being at about 50 % of the respective installed capacities) and then from ~ 855 MW to 661 MW (in case of wind power production being at maximum), whereas under the revised project set-up, it would vary from 400 MW (in case of no wind power production) to 61 MW (in case of wind power production). The transmission capacity available to the market towards Denmark would have varied under the initial project set-up from 600 MW (in case of no production) to 0 MW (in case of production being at maximum), whereas under the revised project set-up, it would be 400 MW (in case of wind power production being between 0 % and 33 %) and then would vary from 400 MW to 61 MW (in case of wind power production being at maximum).].
44 5. ASSESSMENT › 5.2. Substantial problem for the operation of the system › 5.2.2. The KF system as a first of its kind, Decision_act (EU) 2020/2123
In forcesince 11 Nov 2020