11 3. THE REQUESTED DEROGATIONS › 3.1. Article 16(8) of the Electricity Regulation, Decision_act (EU) 2020/2123

In forcesince 11 Nov 2020

Article 16(8) of the Electricity Regulation sets out that transmission system operators shall not limit the volume of interconnection capacity to be made available to market participants as a means of solving congestion inside their own bidding zone or as a means of managing flows resulting from transactions internal to bidding zones. This paragraph shall be considered to be complied with where, for borders using a coordinated net transmission capacity approach, at least 70 % of the transmission capacity respecting operational security limits after deduction of contingencies, as determined in accordance with the capacity allocation and congestion management guideline, are available for cross-zonal trade. The German and Danish authorities request that this minimum percentage should not apply to the overall transmission capacity respecting operational security limits after deduction of contingencies. Instead, it should apply only to the capacity remaining after all capacity expected to be required for the transmission of production from the wind farms connected to the KF system to shore has been deducted (‘residual capacity’).