According to NACO, opening up the market to a second service supplier would increase total space requirements to 178 000 m2, that is, 32 000 m2 more than the space currently occupied (146 000 m2), thus resulting in a shortfall of 30 000 m2 in terms of the current data on space available (148 000 m2).

Whereas the NACO figures relate to the entry of a second service supplier, the Fraunhofer figures are based on opening up the market to two additional service suppliers in Terminal 2. According to the Fraunhofer Institut, the total space required would increase from 150 000 to 167 000 m2: at Terminal 2, the requirement for parking areas would increase by 14 000 to 29 000 m2, whereas only 18 000 m2 is available. Opening up these services would have repercussions on Terminal 1: on account of the structural space problems at Terminal 1, the space hitherto borrowed from Terminal 2 would no longer be available as it would be allocated to new service suppliers.

1.2. Works at the airport

The German decision is also based on the fact that the works in progress at the airport will exacerbate the existing space problems.

The airport's internal development plan provides for a large number of works at the airport, including:

(a)

in Terminal 1, alterations to meet the Schengen standards;

(b)

on the tarmac, the extension of Pier A (alpha) and the fitting-out of the western part of the pier.

FAG maintains that this restructuring is justified by the need to react to the increase in traffic.

According to FAG, these works will have repercussions at two levels:

(a)

first, the new buildings will result in a loss of nearly 20 000 m2 of parking space,

(b)

second, while the works are in progress, the space needed to store the construction equipment and the changes resulting from the works, particularly in traffic around the works, will have temporary negative repercussions in terms not only of the space available but also of the traffic near a terminal which already has serious difficulties.

2.

The implications of opening up the market

According to Germany, the space available cannot be extended either inside or outside the airport site. Thus the current lack of space obliges FAG to manage all available areas in an optimal manner. Opening up the market would have repercussions on capacity management, the organization of baggage handling and the quality of services provided at Frankfurt airport.

2.1. Impossibility of extending the airport