The NACO studies attempt to demonstrate that it is impossible to admit a further supplier or a self-handling user. They also conclude that the airport needs to ensure total coordination of all groundhandling activities. However, it must be noted that, for historic reasons, Federal Express has been self-handling certain categories of service and, under the exemption decision, will be able to continue to do so. SAS, in turn, handled its own flights until 1995. It is true that these airlines' operations were or still are on an extremely small scale and, in the case of Federal Express, limited to certain parts of the airport reserved specially for freight and mail and separate from the passenger terminals. These activities may be regarded as marginal for the purposes of application of the Directive. However, this was not the case with Delta's operations in Terminal 2, which show that even with at least one operator other than FAG the airport structures still worked.
Calculations
The Cranfield report estimates the space available at 164 000 m2. This was calculated by starting with the 138 000 m2 declared available today by FAG, then adding the space which should become available from certain freight areas (51 000 m2) and deducting the area actually to be occupied by new buildings (25 000 m2).
2.2. Space requirements
A number of comments must be made on the space requirements as set out in the NACO studies to substantiate the exemption decision, both with regard to the data submitted and on use of the space available.
The figures
The NACO study dated 27 October 1995 indicates that if a second supplier were admitted an extra 20 000 m2 would be needed, assuming a total of three operators, since these figures are based on the assumption that, in addition to FAG, Delta was still running its own self-handling operations. In the current situation, now that Delta has abandoned self-handling and FAG acknowledges that it occupies 146 000 m2 itself, NACO estimates that a further 32 000 m2 would be needed (giving a total of 178 000 m2) instead of the 20 000 m2 when Delta was operating. The NACO studies also calculated that the total space which would have been required if Delta had continued self-handling operations - that is, if a second operator (self-handling user) were active at the airport, would be just 155 000 m2.