9 2. THE ISLAND OF CRETE › The electricity system and electricity market in the island of Crete, Decision_act (EU) 2024/1274

In forcesince 29 Apr 2024

In sum, according to the hybrid model, the Greek electricity power exchange HEnEX submits orders for the entire load and thermal generation in Crete to both the day-ahead and intraday markets. Those submissions are made on behalf of all load representatives and thermal generators in Crete. All RES contracts have been transferred to the Operator of Renewable Energy Sources & Guarantees of Origin (‘DAPEEP’) by way of Ministerial decision and all relevant metering data for both existing and new RES in Crete are provided to DAPEEP by the Distribution System Operator (‘HEDNO S.A.’). Simultaneously, DAPEEP submits orders for all RES generation in Crete. Based on those orders, the total electricity demand, as forecasted by the Greek Transmission System Operator (‘IPTO S.A.’), is allocated to load representatives in accordance with their supply percentage ratio calculated ex ante on a monthly basis by HEDNO S.A.. Upon completion of that process, the complete load and generation profile of Crete are virtually introduced into the day-ahead and intraday markets of the Greek mainland interconnected system.