43 4. ASSESSMENT › 4.3. No obstruction to the transition towards renewable energy, increased flexibility, energy storage, electro-mobility and demand response, Decision_act (EU) 2024/1274

In forcesince 29 Apr 2024

Article 64 of Regulation (EU) 2019/943 does not require that derogation decisions maximise the potential for flexibility or energy storage. A derogation under that Article only aims to ensure that it does not obstruct such transition. In other words, the derogation should not prevent developments which, without the derogation, would occur naturally. It is unlikely that, absent the derogation, well-functioning forward, day-ahead, intraday and balancing markets would develop in each of the electricity systems in the island of Crete. This is due to the challenges linked to the operation of the small connected electricity systems, the very low levels of competition in the generation segment, and the lack of connection to the mainland market. In that respect, the limited duration of the derogation, and the readiness for a full market operation as soon as Phase II is completed, is of utmost importance.