(a)
For the use of the increased bank angles requiring special approval, the following criteria shall be met:
1.
the Aeroplane Flight Manual must contain approved data for the required increase of operating speed and data to allow the construction of the flight path considering the increased bank angles and speeds;
2.
visual guidance must be available for navigation accuracy;
3.
weather minima and wind limitations must be specified for each runway and approved by the Authority;
4.
training in accordance with OPS 1.975.