Simulating economic decisions on the basis of costs and revenues for a single year is not in line with standard economic practice, as it could lead to the premature exit of some power plants from the market even though they may be profitable over the economic lifetime of the asset. Moreover, Poland has not submitted sufficient evidence as regards the maintenance schedules of power plants. Therefore, to align these elements in the NRAA with the Electricity Regulation and the ERAA methodology, the NRAA should estimate the likelihood of retirement, mothballing and new-build of generation assets on the basis of estimated revenues and costs over a ten-year period, rather than for a single year. Furthermore, Poland should justify the assumptions on maintenance patterns on the basis of actual maintenance schedules and explain how these patterns relate to the estimates in the NRAA, in order to demonstrate that they constitute a national specificity of the Polish generator fleet.
135 5. ASSESSMENT OF THE REQUESTED DEROGATION › 5.3. Article 64(2c) of the Electricity Regulation › 5.3.2. Article 64(2c) point (b): Primary auction processes – amount of capacity insufficient to address the adequacy concern › 5.3.2.1. Adequacy concern identified by the NRAA › Difference regarding the modelling of capacity resources, Decision_act (EU) 2026/341
In forcesince 11 Aug 2025