Poland submits that, after deducting from the required capacity obligation the volumes already contracted through the primary auctions for the delivery years covered by the derogation (see Table 2 below) as well as other capacities considered available to the system (e.g. those supported through other schemes), a gap still remains. The ATC represents the amount of capacity to be contracted in each auction in accordance with the methodology described in recital (14) above. All values are given in MW.
Table 2
Source: Ministry of Climate and Environment, Poland.
Year | ATC (main auction) | Main auction contracted volume | ATC (additional auction Q1) | ATC (additional auction Q2) | ATC (additional auction Q3) | ATC (additional auction Q4) | Additional auction Q1 contracted volume | Additional auction Q2 contracted volume | Additional auction Q3 contracted volume | Additional auction Q4 contracted volume
2025 | 2526 | 2367,304 | 3520 | 1131 | 500 | 842 | 3144,653 | 1142,555 | 524,569 | 830,866
2026 | 7991 | 7188,584 | 2450 | 100 | 100 | 5010 | 2022,723 | 87,524 | 93,524 | 2387,759
2027 | 6237 | 5379,156 | 1909 | 100 | 100 | 1284 | n/a | n/a | n/a | n/a
2028 | 5791 | 7070,951 | n/a | n/a | n/a | n/a | n/a | n/a | n/a | n/a