The Annex to Commission Regulation (EU) No 1299/2014 is amended as follows:
section 1.1 is replaced by the following:
This TSI concerns the infrastructure subsystem and part of the maintenance subsystem of the Union rail system in accordance with Article 1 of Directive (EU) 2016/797.
The infrastructure and the maintenance subsystems are defined respectively in points 2.1 and 2.8 of Annex II to Directive (EU) 2016/797.
The technical scope of this TSI is further defined in Article 2(1), 2(5) and 2(6) of this Regulation.’;
point (1) of section 1.3 is replaced by the following:
‘(1) In accordance with Article 4(3) of Directive (EU) 2016/797, this TSI:
indicates its intended scope (section 2);
lays down essential requirements for the infrastructure and part of the maintenance subsystems (section 3);
establishes the functional and technical specifications to be met by the infrastructure and part of the maintenance subsystems and its interfaces vis-à-vis other subsystems (section 4);
specifies the interoperability constituents and interfaces which must be covered by European specifications, including European standards, which are necessary to achieve interoperability within the Union rail system (section 5);
states, in each case under consideration, which procedures are to be used in order to assess the conformity or the suitability for use of the interoperability constituents, on the one hand, or the EC verification of the subsystems, on the other hand (section 6);
indicates the strategy for implementing this TSI (section 7);
indicates, for the staff concerned, the professional qualifications and health and safety conditions at work required for the operation and maintenance of the infrastructure subsystem, as well as for the implementation of this TSI (section 4);
indicates the provisions applicable to the existing infrastructure subsystem, in particular in the event of upgrading and renewal and, in such cases, the modification work which requires an application for a new authorisation;
indicates the parameters of infrastructure subsystem to be checked by the railway undertaking and the procedures to be applied to check those parameters after the delivery of the vehicle authorisation for placing on the market and before the first use of the vehicle to ensure compatibility between vehicles and the routes on which they are to be operated.
In accordance with Article 4(5) of the Directive (EU) 2016/797, provisions for specific cases are indicated in section 7.’;
section 2.1 is replaced by the following:
This TSI covers:
the infrastructure structural subsystem
the part of the maintenance functional subsystem relating to the infrastructure subsystem (that is: washing plants for external cleaning of trains, water restocking, refuelling, fixed installations for toilet discharge and electrical shore supplies).
The elements of the infrastructure subsystem are described in point 2.1 of Annex II to Directive (EU) 2016/797.
The elements of the maintenance subsystem are described in point 2.8 of Annex II to Directive (EU) 2016/797.
The scope of this TSI therefore includes the following aspects of the infrastructure subsystem:
Line layout,
Track parameters,
Switches and crossings,
Track resistance to applied loads,
Structures resistance to traffic loads,
Immediate action limits on track geometry defects,
Platforms,
Health, safety and environment,
Provision for operation,
Fixed installations for servicing trains.
Further details are set out in point 4.2.2 of this TSI.’;
in section 2.5, the reference to ‘Directive 2004/49/EC’ is replaced by the reference to ‘Directive (EU) 2016/798’;
in section 3, the reference to ‘Directive 2008/57/EC’ is replaced by the reference to ‘Directive (EU) 2016/797’;
Table 1 in section 3 is replaced by the following:
TSI point | Title of TSI point | Safety | Reliability Availability | Health | Environ-mental protection | Technical compatibility | Accessibility
4.2.3.1 | Structure gauge | 1.1.1, 2.1.1 | | | | 1.5 |
4.2.3.2 | Distance between track centres | 1.1.1, 2.1.1 | | | | 1.5 |
4.2.3.3 | Maximum gradients | 1.1.1 | | | | 1.5 |
4.2.3.4 | Minimum radius of horizontal curve | 1.1.3 | | | | 1.5 |
4.2.3.5 | Minimum radius of vertical curve | 1.1.3 | | | | 1.5 |
4.2.4.1 | Nominal track gauge | | | | | 1.5 |
4.2.4.2 | Cant | 1.1.1, 2.1.1 | | | | 1.5 | 1.6.1
4.2.4.3 | Cant deficiency | 1.1.1 | | | | 1.5 |
4.2.4.4 | Abrupt change of cant deficiency | 2.1.1 | | | | |
4.2.4.5 | Equivalent conicity | 1.1.1, 1.1.2 | | | | 1.5 |
4.2.4.6 | Railhead profile for plain line | 1.1.1, 1.1.2 | | | | 1.5 |
4.2.4.7 | Rail inclination | 1.1.1, 1.1.2 | | | | 1.5 |
4.2.5.1 | Design geometry of switches and crossings | 1.1.1, 1.1.2, 1.1.3 | | | | 1.5 |
4.2.5.2 | Use of swing nose crossings | 1.1.2, 1.1.3 | | | | |
4.2.5.3 | Maximum unguided length of fixed obtuse crossings | 1.1.1, 1.1.2 | | | | 1.5 |
4.2.6.1 | Track resistance to vertical loads | 1.1.1, 1.1.2, 1.1.3 | | | | 1.5 |
4.2.6.2 | Longitudinal track resistance | 1.1.1, 1.1.2, 1.1.3 | | | | 1.5 |
4.2.6.3 | Lateral track resistance | 1.1.1, 1.1.2, 1.1.3 | | | | 1.5 |
4.2.7.1 | Resistance of new bridges to traffic loads | 1.1.1, 1.1.3 | | | | 1.5 |
4.2.7.2 | Equivalent vertical loading for new earthworks and earth pressure effects imposed on new structures | 1.1.1, 1.1.3 | | | | 1.5 |
4.2.7.3 | Resistance of new structures over or adjacent to tracks | 1.1.1, 1.1.3 | | | | 1.5 |
4.2.7.4 | Resistance of existing bridges and earthworks to traffic loads | 1.1.1, 1.1.3 | | | | 1.5 |
4.2.8.1 | The immediate action limit for alignment | 1.1.1, 1.1.2 | 1.2 | | | |
4.2.8.2 | The immediate action limit for longitudinal level | 1.1.1, 1.1.2 | 1.2 | | | |
4.2.8.3 | The immediate action limit for track twist | 1.1.1, 1.1.2 | 1.2 | | | |
4.2.8.4 | The immediate action limit of track gauge as isolated defect | 1.1.1, 1.1.2 | 1.2 | | | |
4.2.8.5 | The immediate action limit for cant | 1.1.1, 1.1.2 | 1.2 | | | |
4.2.8.6 | The immediate action limit for switches and crossings | 1.1.1, 1.1.2 | 1.2 | | | 1.5 |
4.2.9.1 | Usable length of platforms | 1.1.1, 2.1.1 | | | | 1.5 |
4.2.9.2 | Platform height | 1.1.1, 2.1.1 | | | | 1.5 | 1.6.1
4.2.9.3 | Platform offset | 1.1.1, 2.1.1 | | | | 1.5 | 1.6.1
4.2.9.4 | Track layout alongside platforms | 1.1.1, 2.1.1 | | | | 1.5 | 1.6.1
4.2.10.1 | Maximum pressure variations in tunnels | 1.1.1, 2.1.1 | | | | 1.5 |
4.2.10.2 | Effect of cross winds | 1.1.1, 2.1.1 | 1.2 | | | 1.5 |
4.2.10.3 | Aerodynamic effect on ballasted track | 1.1.1 | 1.2 | | | 1.5 |
4.2.11.1 | Location markers | 1.1.1 | 1.2 | | | |
4.2.11.2 | Equivalent conicity in service | 1.1.1, 1.1.2 | | | | 1.5 |
4.2.12.2 | Toilet discharge | 1.1.5 | 1.2 | 1.3.1 | | 1.5 |
4.2.12.3 | Train external cleaning facilities | | 1.2 | | | 1.5 |
4.2.12.4 | Water restocking | 1.1.5 | 1.2 | 1.3.1 | | 1.5 |
4.2.12.5 | Refuelling | 1.1.5 | 1.2 | 1.3.1 | | 1.5 |
4.2.12.6 | Electric shore supply | 1.1.5 | 1.2 | | | 1.5 |
4.4 | Operating rules | | 1.2 | | | |
4.5 | Maintenance rules | | 1.2 | | | |
4.6 | Professional qualifications | 1.1.5 | 1.2 | | | |
4.7 | Health and safety conditions | 1.1.5 | 1.2 | 1.3 | 1.4.1’ | |
in point (1) of section 4.1, the reference to ‘Directive 2008/57/EC’ is replaced by the reference to ‘Directive (EU) 2016/797’;
point (3) of section 4.1 is replaced by the following:
‘(3) The functional and technical specifications of the infrastructure and part of the maintenance subsystems and their interfaces, as described in points 4.2 and 4.3, do not impose the use of specific technologies or technical solutions, except where this is strictly necessary for the interoperability of the Union rail system.’;
the title of section 4.2 is replaced by the following
points (1) to (3) of section 4.2.1 are replaced by the following:
‘(1) The elements of the Union's rail network are set out in point 1 of Annex I to Directive (EU) 2016/797. In order to deliver interoperability cost-effectively, each element of the Union's rail network shall be assigned a “TSI category of line”.
The TSI category of line shall be a combination of traffic codes. For lines where only one type of traffic is carried (for example, a freight only line), a single code may be used to describe the performances; where mixed traffic runs the category will be described by one or more codes for passenger and freight. The combined traffic codes describe the envelope within which the desired mix of traffic can be accommodated.
These TSI categories of line shall be used for the classification of existing lines to define a target system so that the relevant performance parameters will be met.’;
in point (7) of section 4.2.1, note (*) of Table 3 is replaced by the following:
‘(*) Axle load is based on design mass in working order for power heads and locomotives as defined in point 2.1 of EN 15663:2009+AC:2010 and design mass under normal payload for other vehicles in accordance with point 6.3 of EN15663:2009+AC:2010.’;
point (10) of section 4.2.1 is replaced by the following:
‘(10) In accordance with Article 4(7) of Directive (EU) 2016/797 which provides that TSIs shall not prevent the Member States from deciding on the use of infrastructures for the movement of vehicles not covered by the TSIs, it is allowed to design new and upgraded lines able to accommodate:
gauges larger,
axle loads higher,
speeds greater,
usable length of platform greater,
trains longer
than those specified in Table 2 and Table 3.’;
point (c) of point H in section 4.2.2.1 is replaced by the following:
‘(c) Aerodynamic effect on ballasted track (4.2.10.3)’;
in point K of section 4.2.2.1 the following point is added:
‘(b) Maintenance plan (4.5.2).’;
point (5) in section 4.2.4.2 is replaced by the following:
‘(5) Instead of point (1), for the 1668 mm track gauge system, the design cant shall not exceed 185 mm.’;
point (4) in section 4.2.4.4 is replaced by the following:
‘(4) Instead of point (1), for the 1668 mm track gauge system, the maximum design values of abrupt change of cant deficiency shall be:
150 mm for V ≤ 45 km/h
115 mm for 45 km/h < V ≤ 100 km/h,
(399-V)/2.6 [mm] for 100 km/h < V ≤ 220 km/h,
70 mm for 220 km/h < V ≤ 230 km/h,
Abrupt change of cant deficiency is not allowed for speeds of more than 230 km/h.’;
point (3) in section 4.2.4.5 is replaced by the following:
‘(3) Design track gauge, rail head profile and rail inclination for plain line shall be selected to ensure that the equivalent conicity limits set out in Table 10 are not exceeded.’;
figure 1 in section 4.2.4.6 is replaced by the following:
’
point (2) in section 4.2.4.7.1 is replaced by the following:
‘(2) For tracks intended to be operated at speeds greater than 60 km/h, the rail inclination for a given route shall be selected from the range 1/20 to 1/40.’;
point (2) in section 4.2.6.2.2 is replaced by the following:
‘(2) Provisions for the use of eddy current braking systems on track shall be defined at operational level by the infrastructure manager on the basis of the specific characteristics of the track, including switches and crossings. The conditions of use of this braking system are registered in accordance with Commission Implementing Regulation (EU) 2019/777 [Commission Implementing Regulation (EU) 2019/777 of 16 May 2019 on the common specifications for the register of railway infrastructure and repealing Implementing Decision 2014/880/EU (OJ L 139 I, 27.5.2019, p. 312).’;] (RINF).
Table 11 in section 4.2.7.1.1 is replaced by the following:
Type of traffic | Minimum factor alpha (α)
P1, P2, P3, P4 | 1,0
P5 | 0,91
P6 | 0,83
P1520 | 1
P1600 | 1,1
F1, F2, F3 | 1,0
F4 | 0,91
F1520 | 1,46
F1600 | 1,1’
section 4.2.10.3 is replaced by the following:
The aerodynamic interaction between rolling stock and infrastructure may cause the lifting and further blowing away of ballast stones from the track bed in plain line and switches and crossings (Ballast pick up). This risk shall be mitigated.
The requirements for the infrastructure subsystem aimed at mitigating the risk for “ballast pick up” apply only to lines intended to be operated at speed greater than 250 km/h.
The requirements of point (2) above are an open point.’;
section 4.2.12.2 is replaced by the following:
Fixed installations for toilet discharge shall be compatible with the characteristics of the retention toilet system specified in the LOC & PAS TSI.’;
point (1) in section 4.2.12.4 is replaced by the following:
‘(1) Fixed equipment for water restocking shall be compatible with the characteristics of the water system specified in the LOC & PAS TSI.’;
section 4.2.12.5 is replaced by the following:
Refuelling equipment shall be compatible with the characteristics of the fuel system specified in the LOC & PAS TSI.’;
section 4.2.12.6 is replaced by the following:
Where provided, electrical shore supply shall be by means of one or more of the power supply systems specified in the LOC & PAS TSI.’;
Table 15 in section 4.3.1 is replaced by the following:
Interface | Reference Infrastructure TSI | Reference Locomotives and Passenger Rolling Stock TSI
Track gauge |
4.2.4.1 Nominal track gauge
4.2.5.1 Design geometry of switches and crossings
4.2.8.6 The immediate action limits for switches and crossings
4.2.3.5.2.1 Mechanical and geometrical characteristics of wheelset
4.2.3.5.2.3 Variable gauge wheelsets
Gauge |
4.2.3.1 Structure gauge
4.2.3.2 Distance between track centres
4.2.3.5 Minimum radius of vertical curve
4.2.9.3 Platform offset
4.2.3.1 Gauging
Axle load and axle spacing |
4.2.6.1 Track resistance to vertical loads
4.2.6.3 Lateral track resistance
4.2.7.1 Resistance of new bridges to traffic loads
4.2.7.2 Equivalent vertical loading for new earthworks and earth pressure effects imposed on new structures
4.2.7.4 Resistance of existing bridges and earthworks to traffic loads
4.2.2.10 Load conditions and weighed mass
4.2.3.2.1 Axle load parameter
Running characteristics |
4.2.6.1 Track resistance to vertical loads
4.2.6.3 Lateral track resistance
4.2.7.1.4 Nosing forces
4.2.3.4.2.1 Limit values for running safely
4.2.3.4.2.2 Track loading limit values
Ride stability |
4.2.4.4 Equivalent conicity
4.2.4.6 Railhead profile for plain line
4.2.11.2 Equivalent conicity in service
4.2.3.4.3 Equivalent conicity
4.2.3.5.2.2 Mechanical and geometrical characteristics of wheels
Longitudinal actions |
4.2.6.2 Longitudinal track resistance
4.2.7.1.5 Actions due to traction and braking (longitudinal loads)
4.2.4.5 Braking performance
Minimum horizontal curve radius |
4.2.3.4 Minimum radius of horizontal curve
4.2.3.6 Minimum curve radius
Annex A, A.1 Buffers
Running dynamic behaviour |
4.2.4.3 Cant deficiency
4.2.3.4.2 Running dynamic behaviour
Maximum deceleration |
4.2.6.2 Longitudinal track resistance
4.2.7.1.5 Actions due to traction and braking
4.2.4.5 Braking performance
Aerodynamic effect |
4.2.3.2 Distance between track centres
4.2.7.3 Resistance of new structures over or adjacent to tracks
4.2.10.1 Maximum pressure variations in tunnels
4.2.10.3 Aerodynamic effect on ballasted track
4.2.6.2.1 Slipstream effects on passengers on platforms and on trackside workers
4.2.6.2.2 Head pressure pulse
4.2.6.2.3 Maximum pressure variations in tunnels
4.2.6.2.5 Aerodynamic effect on ballasted tracks
Crosswind |
4.2.10.2 Effect of crosswinds
4.2.6.2.4 Crosswind
Installations for servicing trains |
4.2.12.2 Toilet discharge
4.2.12.3 Train external cleaning facilities
4.2.12.4 Water restocking
4.2.12.5 Refuelling
4.2.12.6 Electric shore supply
4.2.11.3 Toilet discharge system
4.2.11.2.2 Exterior cleaning through a washing plant
4.2.11.4 Water refilling equipment
4.2.11.5 Interface for water refilling
4.2.11.7 Refuelling equipment
4.2.11.6 Special requirements for stabling of trains’
Table 16 in section 4.3.1 is replaced by the following:
Interface | Reference Infrastructure TSI | Reference Freight wagons TSI
Track gauge |
4.2.4.1 Nominal track gauge
4.2.4.6 Railhead profile for plain line
4.2.5.1 Design geometry of switches and crossings
4.2.8.6 The immediate action limits for switches and crossings
4.2.3.6.2 Characteristics of wheelsets
4.2.3.6.3 Characteristics of wheels
Gauge |
4.2.3.1 Structure gauge
4.2.3.2 Distance between track centres
4.2.3.5 Minimum radius of vertical curve
4.2.9.3 Platform offset
4.2.3.1 Gauging
Axle load and axle spacing |
4.2.6.1 Track resistance to vertical loads
4.2.6.3 Lateral track resistance
4.2.7.1 Resistance of new bridges to traffic loads
4.2.7.2 Equivalent vertical loading for new earthworks and earth pressure effects imposed on new structures
4.2.7.4 Resistance of existing bridges and earthworks to traffic loads
4.2.3.2 Compatibility with load carrying capacity of lines
Running dynamic behaviour |
4.2.8 Immediate action limits on track geometry defects
4.2.3.5.2 Running dynamic behaviour
Longitudinal actions |
4.2.6.2 Longitudinal track resistance
4.2.7.1.5 Actions due to traction and braking (longitudinal loads)
4.2.4.3.2 Brake performance
Minimum curve radius |
4.2.3.4 Minimum radius of horizontal curve
4.2.2.1 Mechanical interface
Vertical curve |
4.2.3.5 Minimum radius of vertical curve
4.2.3.1 Gauging’
Table 19 in section 4.3.4 is replaced by the following:
Interface | Reference Infrastructure TSI | Reference Operation and Traffic Management TSI
Ride stability |
4.2.11.2 Equivalent conicity in service
4.2.3.4.4 Operational quality
Use of eddy current brakes |
4.2.6.2 Longitudinal track resistance
4.2.2.6.2 Braking performance
Crosswinds |
4.2.10.2 Effect of crosswinds
4.2.3.6.3 Contingency arrangements
Operating rules |
4.4 Operating rules
4.2.1.2.2.2 Modifications to information contained in the route book
4.2.3.6 Degraded operation
Staff competences |
4.6 Professional competences
2.2.1 Staff and trains’
in point (1) of section 4.4, the terms ‘Article 18(3) and set out in Annex VI (point I.2.4) of Directive 2008/57/EC’ are replaced by the terms ‘Article 15(4) and set out in Annex IV (point 2.4) of Directive (EU) 2016/797’;
section 4.5.2 is replaced by the following:
The infrastructure manager shall have a maintenance plan containing the items listed in point 4.5.1 together with at least the following:
a set of values for intervention limits and alert limits,
a statement about the methods, professional competences of staff and personal protective safety equipment necessary to be used,
the rules to be applied for the protection of people working on or near the track,
the means used to check that in-service values are respected,
the measures taken, for speed greater than 250 km/h, to mitigate the risk of ballast pick up.’;
point (1) in section 4.7 is replaced by the following:
‘(1) the health and safety conditions of staff required for the operation and maintenance of the infrastructure subsystem shall be compliant with the relevant European and national legislation.’;
point (b) of point (2) in section 5.3.2 is replaced by the following:
‘(b) the rail fastening shall resist application of 3000000 cycles of the typical load applied in a sharp curve, such that the change in performance of the fastening system shall not exceed:
20 % in terms of clamping force,
25 % in terms of vertical stiffness,
a reduction of more than 20 % in terms of longitudinal restraint.
The typical load shall be appropriate to:
the maximum axle load the rail fastening system is designed to accommodate,
the combination of rail, rail inclination, rail pad and type of sleepers with which the fastening system may be used.’;
section 6.1.4.1 is replaced by the following:
in accordance with Article 10(3) of Directive (EU) 2016/797, for interoperability constituents that are the subject of other legal acts of the Union covering other matters, the EC declaration of conformity or suitability for use shall state that the interoperability constituents also meet the requirements of those other legal acts;
in accordance with Annex I to Commission Implementing Regulation (EU) 2019/250 [Commission Implementing Regulation (EU) 2019/250 of 12 February 2019 on the templates for “EC” declarations and certificates for railway interoperability constituents and subsystems, on the model of declaration of conformity to an authorised railway vehicle type and on the “EC” verification procedures for subsystems in accordance with Directive (EU) 2016/797 of the European Parliament and of the Council and repealing Commission Regulation (EU) No 201/2011 (OJ L 42, 13.2.2019, p. 9).’;], the EC declaration of conformity or suitability for use shall include a list of restrictions or conditions of use.
in point (1) of section 6.2.1, the reference to ‘Article 18 of Directive 2008/57/EC’ is replaced by the reference to ‘Article 15 of Directive (EU) 2016/797’;
point (6) of section 6.2.1 is replaced by the following:
‘(6) The applicant shall draw up the EC declaration of verification for the infrastructure subsystem in accordance with Article 15 of Directive (EU) 2016/797’;
in section 6.2.4 the following point is added after point 6.2.4.14:
The assessment of the requirements laid down in point 4.2.6.2.2(2) is not required.’;
point (3) of section 6.4 is replaced by the following:
‘(3) The notified body shall include a reference to the maintenance file required by point 4.5.1 of this TSI in the technical file referred to in Article 15(4) of Directive (EU) 2016/797.’;
in point (2) of section 6.5.2, the reference to ‘Article 17 of Directive 2008/57/EC’ is replaced by the reference to ‘Article 14 of Directive (EU) 2016/797’;
the first paragraph in section 7 above section 7.1 is replaced by the following:
‘Member States shall develop a national plan for the implementation of this TSI, considering the coherence of the entire rail system of the European Union. This plan shall include all projects regarding new, renewal and upgrading of infrastructure subsystem, in line with the details mentioned in points 7.1 to 7.7 here below.’;
section 7.3.1 is replaced by the following:
In accordance with Article 2(14) of Directive (EU) 2016/797, “upgrading” means any major modification work on a subsystem or part of it which results in a change in the technical file accompanying the “EC” declaration of verification, if that technical file exists, and which improves the overall performance of the subsystem.