Open points that relate to technical compatibility between the vehicle and the network:
Element of the Rolling Stock sub-system | Clause of this TSI | Technical aspect not covered by this TSI | Comments
Compatibility with train detection systems | 4.2.3.3.1 | See specification referenced in Annex J-2, index 1. | Open points also identified in the TSI CCS.
Running dynamic behaviour for 1520 mm track gauge system |
4.2.3.4.2
4.2.3.4.3
Running dynamic behaviour. Equivalent conicity. | Normative documents referred to in the TSI are based on experience gained on the 1435 mm system.
Braking system independent of adhesion conditions | 4.2.4.8.3 | Eddy current track brake |
Equipment not mandatory.
Electromagnetic compatibility with concerned network.
Aerodynamic effect on ballasted track for RST of design speed > 250 km/h | 4.2.6.2.5 | Limit value and conformity assessment in order to limit risks induced by the projection of ballast |
On-going work within CEN.
Open point also in TSI INF.
Open points that do not relate to technical compatibility between the vehicle and the network:
Element of the Rolling Stock sub-system | Clause of this TSI | Technical aspect not covered by this TSI | Comments
Fire Containment and Control Systems | 4.2.10.3.4 | Conformity assessment of FCCS other than full partitions. | Assessment procedure of efficiency for controlling fire and smoke developed by CEN according to a request for standard issued by ERA.