Operating aid for the promotion of energy from renewable sources and of renewable hydrogen in small projects and renewable energy communities, with the exception of electricity produced from renewable hydrogen, shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled.
For the purposes of this Article small projects are defined as follows:
for electricity generation or storage – projects below or equal to 1 MW of installed capacity;
for electricity consumption – projects with a maximum demand below or equal to 1 MW;
for heat generation and gas production technologies – projects below or equal to 1 MW of installed capacity or equivalent;
for the production of renewable hydrogen – projects below or equal to 3 MW of installed capacity or equivalent;
for the production of biofuels, bioliquids, biogas (including biomethane) and biomass fuels – projects below or equal to an installed capacity of 50000 tonnes/year;
for 100 % SME-owned projects and demonstration projects – projects below or equal to 6 MW installed capacity or maximum demand;
for projects 100 % owned by micro or small enterprises for wind generation only – projects below or equal to 18 MW of installed capacity.
Aid to renewable energy communities shall be exempted from the notification requirement of Article 108(3) of the Treaty only for projects with an installed capacity or maximum demand below or equal to 6 MW from all renewable sources except for wind energy only, for which aid shall be granted to installations with an installed capacity below or equal to 18 MW.
Operating aid for the production of hydrogen shall be exempted from the notification requirement of Article 108(3) of the Treaty only for installations producing exclusively renewable hydrogen.
Operating aid for the production of biofuels, bioliquids, biogas (including biomethane) and biomass fuels shall be exempted from the notification requirement of Article 108(3) of the Treaty only to the extent that the aided fuels are compliant with the sustainability and greenhouse gases emissions saving criteria of Directive (EU) 2018/2001 and its implementing or delegated acts and are made from the feedstock listed in Annex IX to that Directive.
Aid shall not be granted for biofuels which are subject to a supply or blending obligation.
Aid shall be limited to the minimum needed for carrying out the aided project or activity. This condition is fulfilled if the aid corresponds to the net extra cost (‘funding gap’) necessary to meet the objective of the aid measure, compared to the counterfactual scenario in the absence of aid. A detailed assessment of the net extra cost is not required if the aid amounts are determined through a competitive bidding process, because the latter provides a reliable estimate of the minimum aid required by potential beneficiaries.
Aid shall only be granted over the lifetime of the project.
Aid shall be granted as a premium in addition to the market price or in the form of a contract for difference whereby the generators sell their electricity directly in the market.
Aid beneficiaries shall be subject to standard balancing responsibilities. Beneficiaries may outsource balancing responsibilities to other undertakings on their behalf, such as aggregators. Furthermore, aid shall not be paid for any periods where prices are negative. For the avoidance of doubt, this applies as of the moment when prices turn negative.
Small-scale renewable electricity installations and demonstration projects may benefit from aid in the form of direct price support that covers the full costs of operation and from an exemption from the requirement to sell the electricity produced on the market, in accordance with Article 4(3) of Directive (EU) 2018/2001. Installations will be considered as small-scale for the purposes of this paragraph if their capacity is below the applicable threshold under Article 5(2), point (b), or Article 5(4) of Regulation (EU) 2019/943.