Investment aid for environmental protection, including aid for the reduction and removal of greenhouse gas emissions, shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled.
This Article shall not apply to measures for which more specific rules are laid down in Articles 36a, 36b and 38 to 48. This Article shall also not apply to investments in equipment, machinery and industrial production facilities using fossil fuels, including those using natural gas. This is without prejudice to the possibility to grant aid for the installation of add-on components improving the level of environmental protection of existing equipment, machinery and industrial production facilities, in which case the investment shall result neither in the expansion of the production capacity nor higher consumption of fossil fuels.
This Article shall also apply to investments in equipment and machinery using, and infrastructure transporting, hydrogen to the extent that the hydrogen used or transported qualifies as renewable hydrogen. It shall also apply to investments in equipment and machinery using hydrogen-derived fuels the energy content of which is derived from renewable sources other than biomass and that have been produced in accordance with the methodologies set out for renewable liquid and gaseous transport fuels of non-biological origin in Directive (EU) 2018/2001 and its implementing or delegated acts.
This Article shall also apply to aid for investments in installations, equipment and machinery producing or using, and dedicated infrastructure referred to in Article 2, point (130), last sentence, transporting hydrogen produced from electricity and which does not qualify as renewable hydrogen, to the extent that it can be demonstrated that the electricity-based hydrogen produced, used or transported achieves life-cycle greenhouse gas emissions savings of at least 70 % relative to a fossil fuel comparator of 94g CO2eq/MJ. To determine the life-cycle greenhouse gas emissions savings under this subparagraph, the greenhouse gas emissions linked to the production of electricity used to produce hydrogen shall be determined by the marginal generation unit in the bidding zone where the electrolyser is located in the imbalance settlement periods when the electrolyser consumes electricity from the grid.
In the cases referred to in the first and second subparagraphs, only hydrogen fulfilling the conditions set out in those subparagraphs shall be used, transported or – where relevant – produced throughout the lifetime of the investment. The Member State shall obtain a commitment to that effect.
The investment shall fulfil one of the following conditions:
it shall enable the implementation of a project leading to an increase in the environmental protection of the activities of the beneficiary, beyond Union standards in force, irrespective of the presence of mandatory national standards that are more stringent than the Union standards; for projects linked to or involving dedicated infrastructure referred to in Article 2, point (130), last sentence, for hydrogen within the meaning of paragraph 1b, waste heat or CO2 or including a connection to energy infrastructure for hydrogen within the meaning of paragraph 1b, waste heat or CO2, the increase in the environmental protection may also result from the activities of another entity involved in the infrastructure chain; or
it shall enable the implementation of a project leading to an increase in the environmental protection of the activities of the beneficiary in the absence of Union standards; for projects linked to or involving dedicated infrastructure referred to in Article 2, point (130), last sentence, for hydrogen within the meaning of paragraph 1b, waste heat or CO2 or including a connection to energy infrastructure for hydrogen within the meaning of paragraph 1b, waste heat or CO2, the increase in the environmental protection may also result from the activities of another entity involved in the infrastructure chain; or
it shall enable the implementation of a project leading to an increase in the environmental protection of the activities of the beneficiary to comply with Union standards that have been adopted but are not yet in force; for projects linked to or involving dedicated infrastructure referred to in Article 2, point (130), last sentence, for hydrogen within the meaning of paragraph 1b, waste heat or CO2 or including a connection to energy infrastructure for hydrogen within the meaning of paragraph 1b, waste heat or CO2, the increase in the environmental protection may also result from the activities of another entity involved in the infrastructure chain.
Investments in CO2 capture and transport shall fulfil the following cumulative conditions:
the CO2 capture and/or transport, including individual elements of the CCS or CCU chain, shall be integrated into a complete CCS and/or CCU chain;
the net present value (‘NPV’) of the investment project over its lifetime shall be negative. For the purpose of calculating the project’s NPV, the avoided costs of CO2 emissions shall be taken into account;
the eligible costs shall be exclusively the additional investment costs stemming from capturing the CO2 from a CO2-emitting installation (industrial installation or power plant) or directly from ambient air as well as from buffer storage and transportation of captured CO2 emissions.
When the aid aims at reducing or avoiding direct emissions, the aid must not merely displace the emissions concerned from one sector to another and must overall reduce the targeted emissions; in particular, when the aid aims at reducing greenhouse gas emissions, the aid must not merely displace these emissions from one sector to another and must reduce them overall.
Aid shall not be granted where investments are undertaken to ensure that undertakings merely comply with the Union standards in force. Aid enabling undertakings to comply with Union standards that have been adopted but not yet in force may be granted under this Article provided that the investment for which the aid is granted is implemented and finalised at least 18 months before the date of entry into force of the standard concerned.
The eligible costs shall be the extra investment costs determined by comparing the costs of the investment to those of a counterfactual scenario that would occur in the absence of the aid, as follows:
where the counterfactual scenario consists in carrying out a less environmentally-friendly investment that corresponds to normal commercial practice in the sector or for the activity concerned, the eligible costs shall consist in the difference between the costs of the investment for which State aid is granted and the costs of the less environmentally-friendly investment;
where the counterfactual scenario consists in carrying out the same investment at a later point in time, the eligible costs shall consist in the difference between the costs of the investment for which State aid is granted and the Net Present Value of the costs of the later investment, discounted to the point in time when the aided investment would be undertaken;
where the counterfactual scenario consists in maintaining the existing installations and equipment in operation, the eligible costs shall consist in the difference between the costs of the investment for which State aid is granted and the Net Present Value of the investments in the maintenance, repair and modernisation of the existing installations and equipment, discounted to the point in time when the aided investment would be undertaken;
in the case of equipment subject to leasing agreements, the eligible costs shall consist in the difference in Net Present Value between the leasing of equipment for which State aid is granted and the leasing of the less environmentally-friendly equipment that would be leased in the absence of the aid; the leasing costs shall not include costs relating to the operation of the equipment or installation (fuel costs, insurance, maintenance, other consumables), irrespective of whether they are part of the leasing contract.
In all situations listed in the first subparagraph, points (a) to (d), the counterfactual scenario shall correspond to an investment with comparable output capacity and lifetime that complies with Union standards already in force. The counterfactual scenario shall be credible in the light of legal requirements, market conditions and incentives generated by the EU ETS system.
Where the investment for which State aid is granted consists in the installation of an add-on component to an already existing facility, for which there is no less environmentally-friendly counterfactual investment, the eligible costs shall be the total investment costs.
Where the investment for which State aid is granted consists in the construction of dedicated infrastructure referred to in Article 2, point (130), last sentence, for hydrogen within the meaning of paragraph 1b, waste heat or CO2, that is necessary to enable the increase in the level of environmental protection as referred to in paragraphs 2 and 2a, the eligible costs shall be the total investment costs. Costs for the construction or upgrade of storage facilities, with the exception of storage facilities for renewable hydrogen and hydrogen covered by paragraph 1b, second subparagraph, shall not be eligible.
The costs not directly linked to the achievement of a higher level of environmental protection shall not be eligible.
The aid intensity shall not exceed 40 % of the eligible costs. Where the investment, with the exception of those which rely on the use of biomass, results in a 100 % reduction of the direct greenhouse gas emissions, the aid intensity may reach 50 %.
In case of investments relating to CCS and/or CCU, the aid intensity shall not exceed 30 % of the eligible costs.
The aid intensity may be increased by 10 percentage points for aid granted to medium sized undertakings and by 20 percentage points for aid granted to small undertakings.
The aid intensity may be increased by 15 percentage points for investments located in assisted areas fulfilling the conditions of Article 107(3)(a) of the Treaty and by 5 percentage points for investments located in assisted areas fulfilling the conditions of Article 107(3)(c) of the Treaty.
The aid intensity may reach 100 % of the investment costs where aid is granted in a competitive bidding process, which fulfils all of the following conditions in addition to those laid down in Article 2, point (38):
the aid award shall be based on objective, clear, transparent and non-discriminatory eligibility and selection criteria, defined ex ante and published at least 6 weeks in advance of the deadline for submitting applications, to enable effective competition;
during the implementation of a scheme, in case of a bidding process where all bidders receive aid, the design of said process shall be corrected to restore effective competition in the subsequent bidding processes, for example, by reducing the budget or volume;
ex post adjustments to the bidding process outcome (such as subsequent negotiations on bid results) shall be excluded;
at least 70 % of the total selection criteria used for ranking bids and, ultimately, for allocating the aid in the competitive bidding process shall be defined in terms of aid in relation to the project’s contribution to the environmental objectives of the measure, for example the aid requested per unit of environmental protection to be delivered.
Alternatively to paragraphs 4 to 9, the aid amount shall not exceed the difference between the investment costs directly linked to the achievement of a higher level of environmental protection and the operating profit of the investment. The operating profit shall be deducted from the eligible costs ex ante, on the basis of reasonable projections and verified ex post through a claw-back mechanism.
By way of derogation from paragraph 4, first subparagraph, points (a) to (d), and paragraphs 9 and 10, the eligible costs may be determined without the identification of the counterfactual scenario and in the absence of a competitive bidding process. In that case, the eligible costs shall be the investment costs directly linked to the achievement of a higher level of environmental protection and the applicable aid intensities and bonuses set out in paragraphs 5 to 8 are reduced by 50 %.