Art. 41 Commission Regulation (EU) No 651/2014 of 17 June 2014 declaring certain categories of a…

Investment aid for the promotion of energy from renewable sources, of renewable hydrogen and of high-efficiency cogeneration

In forcesince 1 Jul 2023cited 4×
1.

Investment aid for the promotion of energy from renewable energy sources, of renewable hydrogen and of high-efficiency cogeneration, with the exception of electricity produced from renewable hydrogen, shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled.

1a.

Investment aid for electricity storage projects under this Article shall be exempted from the notification requirement of Article 108(3) of the Treaty only to the extent that it is granted to combined renewable and storage projects (behind-the-meter), where both elements are components of a single investment or where storage is connected to an existing renewable generation installation. The storage component shall absorb at least 75 % of its energy from directly connected renewable energy generation installation, on an annual basis. All investment components (generation and storage) are considered to constitute a single integrated project for verification of compliance with the thresholds set out in Article 4. The same rules shall apply to thermal storage directly connected to a renewable energy production installation.

2.

Investment aid for the production and storage of biofuels, bioliquids, biogas (including biomethane) and biomass fuels shall be exempted from the notification requirement of Article 108(3) of the Treaty only to the extent that the aided fuels are compliant with the sustainability and greenhouse gases emissions saving criteria of Directive (EU) 2018/2001 and its implementing or delegated acts and are made from the feedstock listed in Annex IX to that Directive. The storage component shall obtain at least 75 % of its fuel content from directly connected biofuels, bioliquids, biogas (including biomethane) and biomass fuels production installations, on an annual basis. All investment components (production and storage) are considered to constitute a single integrated project for verification of compliance with the thresholds set out in Article 4 of this Regulation.

3.

Investment aid for the production of hydrogen shall be exempted from the notification requirement of Article 108(3) of the Treaty only for installations producing exclusively renewable hydrogen. For renewable hydrogen projects consisting of an electrolyser and one or more renewable generation units behind a single grid connection point, the capacity of the electrolyser shall not exceed the combined capacity of the renewable generation units. The investment aid may cover dedicated infrastructure for the transmission or distribution of renewable hydrogen, as well as storage facilities for renewable hydrogen.

4.

Investment aid for high-efficiency cogeneration units shall be exempted from the notification requirement of Article 108(3) of the Treaty only to the extent that they provide overall primary energy savings compared to separate production of heat and electricity as provided for by Directive 2012/27/EU or any subsequent legislation replacing this act in full or in part. Investment aid for electricity and thermal storage projects directly connected to high-efficiency cogeneration based on renewable energy sources shall be exempted from the notification requirement of Article 108(3) of the Treaty under the conditions laid down in paragraph 1a of this Article.

4a.

Investment aid for high-efficiency cogeneration shall be exempted from the notification requirement of Article 108(3) of the Treaty only if it is not for fossil fuel fired cogeneration installations, with the exception of natural gas where compliance with the 2030 and 2050 climate targets is ensured in accordance with section 4.30 of Annex 1 to Commission Delegated Regulation (EU) 2021/2139 [Commission Delegated Regulation (EU) 2021/2139 of 4 June 2021 supplementing Regulation (EU) 2020/852 of the European Parliament and of the Council by establishing the technical screening criteria for determining the conditions under which an economic activity qualifies as contributing substantially to climate change mitigation or climate change adaptation and for determining whether that economic activity causes no significant harm to any of the other environmental objectives (OJ L 442, 9.12.2021, p. 1).].

5.

The investment aid shall be granted in respect of newly installed or refurbished capacities. The aid amount shall be independent from the output.

6.

The eligible costs shall be the total investment cost.

7.

The aid intensity shall not exceed:

(a)

45 % of the eligible costs for investments in the production of renewable energy sources, including heat pumps compliant with Annex VII to Directive 2018/2001, renewable hydrogen and high-efficiency cogeneration based on renewable energy sources;

(b)

30 % of the eligible costs for any other investment covered by this Article.

8.

The aid intensity may be increased by 20 percentage points for aid granted to small undertakings and by 10 percentage points for aid granted to medium-sized undertakings.

9.

The aid intensity may be increased by 15 percentage points for investments located in assisted areas fulfilling the conditions of Article 107(3)(a) of the Treaty and by 5 percentage points for investments located in assisted areas fulfilling the conditions of Article 107(3)(c) of the Treaty.

10.

The aid intensity may reach 100 % of the eligible costs where aid is granted in a competitive bidding process, which fulfils all of the following conditions in addition to those laid down in Article 2, point (38):

(a)

the aid award shall be based on objective, clear, transparent and non-discriminatory eligibility and selection criteria, defined ex ante and published at least 6 weeks in advance of the deadline for submitting applications, to enable effective competition;

(b)

during the implementation of a scheme, in case of a bidding process where all bidders receive aid, the design of said process shall be corrected to restore effective competition in the subsequent bidding processes, for example, by reducing the budget or volume;

(c)

ex post adjustments to the bidding process outcome (such as subsequent negotiations on bid results or rationing) shall be excluded;

(d)

at least 70 % of the total selection criteria used for ranking bids and, ultimately, for allocating the aid in the competitive bidding process shall be defined in terms of aid per unit of energy capacity from renewable sources or high efficiency-cogeneration.

  • Regulation (EU) 2023/1315Lawamends

  • Erneuerbaren-Ausbau-Gesetz6aLaw

    … Die in Art. 41 der Verordnung (EU) Nr. 651/2014 zur Feststellung der Vereinbarkeit bestimmter Gruppen von Beihilfen mit dem Binnenmarkt in Anwendung der Artikel 107 und 108 des Vertrages über die Arbeitsweise der Europäischen Union, ABl. …

  • Judgment of the Court (Ninth Chamber) of 7 April 2022. KW and SG v Autonome Provinz Bozen.Decision

    Article 41 of Commission Regulation (EU) No 651/2014 of 17 June 2014 declaring certain categories of aid compatible with the internal market in application of Articles 107 and 108 [TFEU] (OJ 2014 L 187, p. 1), entitled ‘Investment aid …

    7 Apr 2022 · 62021CJ0102

  • Judgment of the General Court (Third Chamber) of 30 November 2022 (Extracts). Republic of Austria v European Commission.Decision

    30 Nov 2022 · 62018TJ0101