Operating aid for the promotion of electricity from renewable energy sources, with the exception of electricity produced from renewable hydrogen, shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled.
Aid shall be granted in a competitive bidding process, which fulfils all of the following conditions in addition to those laid down in Article 2, point (38):
the aid award shall be based on objective, clear, transparent and non-discriminatory eligibility and selection criteria, defined ex ante and published at least 6 weeks in advance of the deadline for submitting applications, to enable effective competition;
during the implementation of a scheme, in case of a bidding process where all bidders receive aid, the design of said process shall be corrected to restore effective competition in the subsequent bidding processes, for example, by reducing the budget or volume;
ex post adjustments to the bidding process outcome (such as subsequent negotiations on bid results or rationing) shall be excluded;
at least 70 % of the total selection criteria used for ranking bids and, ultimately, for allocating the aid in the competitive bidding process shall be defined in terms of aid per unit of electricity output or capacity from renewable sources.
The bidding process shall be open to all generators producing electricity from renewable energy sources on a non-discriminatory basis.
The bidding process can be limited to specific technologies where:
a measure aims specifically to support demonstration projects;
a measure aims to address not only decarbonisation but also air quality or other pollution;
a Member State identifies reasons to expect that eligible sectors or innovative technologies have the potential to make an important and cost-effective contribution to environmental protection and deep decarbonisation in the longer term;
a measure is required to achieve diversification necessary to avoid exacerbating issues related to network stability;
a more selective approach can be expected to lead to lower costs of achieving environmental protection (for example through reduced system integration costs as a result of diversification, including between renewables, which could also include demand response and/or storage), and/or result in less distortion of competition.
Member States shall carry out a detailed assessment of the applicability of such conditions and report it to the Commission according to the modalities described in Article 11(1), point (a).
Where the bidding process is limited to one or more innovative technologies, the aid granted to these technologies shall not exceed 5 % of the planned new electricity capacity from renewable energy sources per year in total.
Aid shall be granted as a premium in addition to the market price or in the form of a contract for difference whereby the generators sell their electricity directly in the market.
Aid beneficiaries shall sell their electricity directly in the market and be subject to standard balancing responsibilities. Beneficiaries may outsource balancing responsibilities to other undertakings on their behalf, such as aggregators. Furthermore, aid shall not be paid for any periods where prices are negative. For the avoidance of doubt, this applies as of the moment when prices turn negative.
Small-scale renewable electricity installations may benefit from aid in the form of direct price support that covers the full costs of operation and from an exemption from the requirement to sell the electricity produced on the market, in accordance with Article 4(3) of Directive (EU) 2018/2001. Installations will be considered as small-scale for the purposes of this paragraph if their capacity is below the applicable threshold under Article 5(2), point (b), or Article 5(4) of Regulation (EU) 2019/943.
Aid may be granted in the absence of a competitive bidding process as described in paragraph 2 to installations with an installed electricity capacity of less than 1 MW for the production of electricity from all renewable sources except for wind energy, where aid may be granted in the absence of a competitive bidding process as described in paragraph 2 to installations with an installed electricity capacity of less than 6 MW or to installations with less than 6 generation units. Without prejudice to paragraph 9, when aid is granted in the absence of a competitive bidding process, the conditions under paragraphs 5, 6 and 7 shall be respected. In addition, when aid is granted in the absence of a competitive bidding process, the conditions under Article 43 paragraphs 5, 6 and 7 shall be applicable.
The conditions under paragraphs 5, 6 and 7 shall not apply to operating aid granted to installations with an installed electricity capacity of less than 500 kW for the production of electricity from all renewable sources except for wind energy, where these conditions shall not apply to operating aid granted to installations with an installed electricity capacity of less than 3 MW or to installations with less than 3 generation units.
For the purpose of calculating the above maximum capacities referred to in paragraphs 8 and 9, installations with a common connection point to the electricity grid shall be considered as one installation.
Aid shall only be granted over the lifetime of the project.