Art. 38a Commission Regulation (EU) No 651/2014 of 17 June 2014 declaring certain categories of a…

Investment aid for energy efficiency measures in buildings

In forcesince 1 Jul 2023cited 1×
1.

Investment aid enabling undertakings to achieve energy efficiency in buildings shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled.

2.

Aid shall not be granted under this Article for investments undertaken to comply with Union standards that have been adopted and are in force.

3.

Aid may be granted under this Article for investments undertaken to comply with Union standards that have been adopted but are not yet in force. Where the relevant Union standards are minimum energy performance standards, the aid must be granted before the standards become mandatory for the undertaking concerned. In that case, the Member State must ensure that beneficiaries provide a precise renovation plan and timetable demonstrating that the aided renovation is at least sufficient to ensure compliance with the minimum energy performance standards. Where the relevant Union standards are different from minimum energy performance standards, the investment must be implemented and finalised at least 18 months before the Union standard enters into force.

4.

This Article shall not apply to aid for cogeneration and aid for district heating and/or cooling.

5.

The eligible costs shall be the total investment costs. The costs not directly linked to the achievement of a higher level of energy efficiency in the building shall not be eligible.

6.

The aid shall induce an improvement in the energy performance of the building measured in primary energy of at least: (i) 20 % compared to the situation prior to the investment in the case of renovation of existing buildings, or (ii) 10 % compared to the situation prior to the investment in the case of renovation measures concerning the installation or replacement of just one type of building elements as defined in Article 2(9) of Directive 2010/31/EU and such targeted renovation measures do not represent more than 30 % of the part of the scheme’s budget dedicated to energy efficiency measures, or (iii) 10 % compared to the threshold set for the nearly zero-energy building requirements in national measures transposing Directive 2010/31/EU in the case of new buildings. The initial primary energy demand and the estimated improvement shall be established by reference to an Energy Performance Certificate as defined in Article 2(12) of Directive 2010/31/EU.

7.

The aid granted for the improvement of the energy efficiency of the building may be combined with aid for any or all of the following measures:

(a)

the installation of integrated on-site equipment generating electricity, heating or cooling from renewable energy sources, including but not limited to photovoltaic panels and heat pumps;

(b)

the installation of equipment for the storage of the energy generated by the on-site renewable energy installations. The storage equipment shall absorb at least 75 % of its energy from a directly connected renewable energy generation installation, on an annual basis;

(c)

the connection to an energy efficient district heating and/or cooling system and related equipment;

(d)

the construction and installation of recharging infrastructure for use by the building users, and related infrastructure, such as ducting, where the parking facilities are located either inside the building or are physically adjacent to the building;

(e)

the installation of equipment for the digitalisation of the building in particular to increase its smart-readiness, including passive in-house wiring or structured cabling for data networks and the ancillary part of the broadband infrastructure on the property to which the building belongs, but excluding wiring or cabling for data networks outside the property;

(f)

investments in green roofs and equipment for the retention and use of rain water.

In case of any such combined works, as set out in points (a) to (f), the entire investment cost of the various installations and equipment shall constitute the eligible costs. The costs not directly linked to the achievement of a higher level of energy or environmental performance shall not be eligible.

8.

The aid may be granted either to the building owner(s) or the tenant(s), depending on who is commissioning the energy efficiency measure.

9.

Aid may also be granted for the improvement of the energy efficiency of the heating or cooling equipment inside the building.

10.

Aid for the installation of energy equipment fired by fossil fuels, including natural gas, shall not be exempted under this Article from the notification requirement of Article 108(3) of the Treaty.

11.

The aid intensity shall not exceed 30 % of the eligible costs.

12.

By way of derogation from paragraph 11, where the investment consists in the installation or replacement of just one type of building element as defined in Article 2(9) of Directive 2010/31/EU, the aid intensity shall not exceed 25 %.

13.

By way of derogation from paragraphs 11 and 12, where aid for investments in buildings undertaken to comply with minimum energy performance standards qualifying as Union standards is granted less than 18 months before the Union standards enter into force, the aid intensity must not exceed 15 % of the eligible costs where the investment consists in the installation or replacement of just one type of building element as defined in Article 2(9) of Directive 2010/31/EU and 20 % in all other cases.

14.

The aid intensity may be increased by 20 percentage points for aid granted to small undertakings and by 10 percentage points for aid granted to medium-sized undertakings.

15.

The aid intensity may be increased by 15 percentage points for investments located in assisted areas fulfilling the conditions of Article 107(3), point (a), of the Treaty and by 5 percentage points for investments located in assisted areas fulfilling the conditions of Article 107(3), point (c), of the Treaty.

16.

The aid intensity may be increased by 15 percentage points for aid granted to improve the energy efficiency of existing buildings, where the aid induces an improvement in the energy performance of the building measured in primary energy of at least 40 % compared to the situation prior to the investment. This increase in aid intensity does not apply where the investment does not improve the energy performance of the building beyond the level imposed by minimum energy performance standards qualifying as Union standards entering into force within less than 18 months from the moment the investment is implemented and finalised.