Investment aid for recharging or refuelling infrastructure shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled.
This Article shall only cover aid granted for recharging or refuelling infrastructures that supply vehicles, mobile terminal equipment or mobile groundhandling equipment with electricity or hydrogen. For aided refuelling infrastructure supplying hydrogen, the Member State shall obtain from the beneficiary a commitment that by 31 December 2035 at the latest, the refuelling infrastructure will solely supply renewable hydrogen. This Article does not apply to aid for investments relating to recharging and refuelling infrastructure in ports.
The eligible costs shall be the costs of the construction, installation, upgrade or extension of recharging or refuelling infrastructure. Those costs may include the costs of the recharging or refuelling infrastructure itself and related technical equipment, the installation of or upgrades to electrical or other components, including electrical cables and power transformers, required for connecting the recharging or refuelling infrastructure to the grid or to a local electricity or hydrogen production or storage unit, as well as civil engineering works, land or road adaptations, installation costs and costs for obtaining related permits.
The eligible costs may also cover the investment costs of on-site production of renewable electricity or renewable hydrogen, and the investment costs of storage units for storing renewable electricity or hydrogen. The nominal production capacity of the on-site renewable electricity or renewable hydrogen production installation shall not exceed the maximum rated output or refuelling capacity of the recharging or refuelling infrastructure to which it is connected.
Aid under this Article shall be granted in a competitive bidding process, which fulfils all of the following conditions in addition to those laid down in Article 2, point (38):
the aid award shall be based on objective, clear, transparent and non-discriminatory eligibility and selection criteria, defined ex ante and published at least 6 weeks in advance of the deadline for submitting applications, to enable effective competition;
during the implementation of a scheme, in case of a bidding process where all bidders receive aid, the design of said process shall be corrected to restore effective competition in the subsequent bidding processes, for example, by reducing the budget or volume;
ex post adjustments to the bidding process outcome (such as subsequent negotiations on bid results) shall be excluded;
at least 70 % of the total selection criteria used for ranking bids and, ultimately, for allocating the aid in the competitive bidding process shall be defined in terms of aid in relation to the project’s contribution to the environmental objectives of the measure for example aid requested per recharging or refuelling point.
Where the aid is granted in a competitive bidding process complying with the conditions of paragraph 4, the aid intensity may reach up to 100 % of the eligible costs.
By way of derogation from paragraph 4, aid may be granted in the absence of a competitive bidding process when the aid is granted based on an aid scheme. In this case, the aid intensity shall not exceed 20 % of the eligible costs. The aid intensity may be increased by 20 percentage points for medium-sized enterprises and by 30 percentage points for small enterprises. The aid intensity may also be increased by 15 percentage points for investments located in assisted areas designated in an approved regional aid map in force at the time of provision of the aid in application of in Article 107(3), point (a), of the Treaty or by 5 percentage points for investments located in assisted areas designated in an approved regional aid map in force at the time of provision of the aid in application of Article 107(3), point (c), of the Treaty.
The aid granted to any one undertaking shall not exceed 40 % of the total budget of the scheme concerned.
Where the recharging or refuelling infrastructure is open for access by users other than the aid beneficiary or beneficiaries, aid shall only be granted for the construction, installation, upgrade or extension of recharging or refuelling infrastructure accessible to the public and providing non-discriminatory access to users, including in relation to tariffs, authentication and payment methods and other terms and conditions of use. The fees charged to users other than the aid beneficiary or beneficiaries for using the recharging or refuelling infrastructure shall correspond to market prices.
Operators of recharging or refuelling infrastructure that offer or allow contract-based payments on their infrastructure shall not discriminate between mobility service providers, for example by applying preferential access conditions, or through price differentiation without an objective justification.
The necessity of aid to invest in recharging or refuelling infrastructure of the same category as the one to be supported with aid (for example, for recharging infrastructure: normal or high power) shall be established through an ex ante open public consultation or an independent market study, which are no older than 1 year at the moment of the entry into force of the aid measure. In particular, it shall be established that no such investment is likely to take place on commercial terms within 3 years from the entry into force of the aid measure.
The obligation to conduct an ex ante open public consultation or an independent market study laid down in the first subparagraph shall not apply to aid for the construction, installation, upgrade or extension of recharging or refuelling infrastructure that is not accessible to the public.
By way of derogation from paragraph 10, the necessity of aid for recharging or refuelling infrastructure for road vehicles shall be presumed where vehicles powered exclusively by electricity (for recharging infrastructures) or vehicles powered at least partially by hydrogen (for refuelling infrastructures) represent respectively less than 3 % of the total number of vehicles of the same category registered in the Member State concerned. For the purpose of this paragraph, passenger cars and light-duty commercial vehicles shall be considered as being part of the same category of vehicles.
Any concession or other entrustment to a third party to operate the supported recharging or refuelling infrastructure shall be assigned on a competitive, transparent and non-discriminatory basis, having due regard to the applicable procurement rules.
Where aid is granted for the deployment of new recharging infrastructure that allows for a transfer of electricity with a power output of less than or equal to 22 kW, the infrastructure must be capable of supporting smart recharging functionalities.