Art. 39 Commission Regulation (EU) No 651/2014 of 17 June 2014 declaring certain categories of a…

Investment aid for energy efficiency projects in buildings in the form of financial instruments

In forcesince 1 Jul 2023cited 2×
1.

Investment aid for energy efficiency projects in buildings shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled.

2.

Eligible for aid under this Article are investments improving the energy efficiency of buildings.

2a.

The aid granted for the improvement of the energy efficiency of the building may be combined with aid for any or all of the following measures:

(a)

the installation of integrated on-site equipment generating electricity, heating or cooling from renewable energy sources, including but not limited to photovoltaic panels and heat pumps;

(b)

the installation of equipment for the storage of the energy generated by the on-site renewable energy installations. The storage equipment shall absorb at least 75 % of its energy from a directly connected renewable energy generation installation, on an annual basis;

(c)

investments in the connection to an energy efficient district heating and/or cooling system and related equipment;

(d)

the construction and installation of recharging infrastructure for use by the building users, and related infrastructure, such as ducting, where the car park is located either inside the building or is physically adjacent to the building;

(e)

the installation of equipment for the digitalisation of the building, in particular to increase its smart-readiness. Eligible investments may include interventions limited to passive in-house wiring or structured cabling for data networks and the ancillary part of the broadband infrastructure on the property to which the building belongs, but excluding wiring or cabling for data networks outside the property;

(f)

investments in green roofs and equipment for the retention and use of rain water.

3.

The eligible costs shall be the total costs of the energy efficiency project, except for buildings referred to in paragraph 2a, where the eligible costs shall be the total costs of the energy efficiency project as well as the investment cost of the various pieces of equipment listed in paragraph 2a.

4.

The aid shall be granted in the form of an endowment, equity, a guarantee or a loan to an energy efficiency fund or other financial intermediary, which shall pass it on to the largest extent possible to the final beneficiaries, being the building owners or tenants, in the form of higher volumes of financing, lower collateral requirements, lower guarantee premiums or lower interest rates.

5.

The energy efficiency fund or other financial intermediary shall grant loans or guarantees to the eligible energy efficiency projects. The nominal value of the loan or the amount guaranteed shall not exceed EUR 25 million per final beneficiary and project, except in the case of the combined investments referred to in paragraph 2a, where it shall not exceed EUR 30 million. The guarantee shall not exceed 80 % of the underlying loan.

6.

The repayment by the building owners to the energy efficiency fund or other financial intermediary shall not be less than the nominal value of the loan.

7.

The energy efficiency aid shall leverage additional investment from independent private investors as defined in Article 2, point (72), reaching at minimum 30 % of the total financing provided to an energy efficiency project. When the aid is provided by an energy efficiency fund, the leverage of such private investment can be done at the level of the energy efficiency fund and/or at the level of the energy efficiency projects, so as to achieve an aggregate minimum 30 % of the total financing provided to an energy efficiency project.

8.

Member States can set up energy efficiency funds and/or can use financial intermediaries when providing energy efficiency aid. The following conditions must then be fulfilled:

(a)

Financial intermediary managers, as well as energy efficiency fund managers shall be selected through an open, transparent and non-discriminatory call in accordance with applicable Union and national laws. In particular, there shall be no discrimination on the basis of their place of establishment or incorporation in any Member State. Financial intermediaries and energy efficiency fund managers may be required to fulfil predefined criteria objectively justified by the nature of the investments;

(b)

The independent private investors shall be selected through an open, transparent and non-discriminatory call in accordance with applicable Union and national laws aimed at establishing the appropriate risk-reward sharing arrangements whereby, for investments other than guarantees, asymmetric profit-sharing shall be given preference over downside protection. If the private investors are not selected by such a call, the fair rate of return to the private investors shall be established by an independent expert selected via an open, transparent and non-discriminatory call;

(c)

In the case of asymmetric loss-sharing between public and private investors, the first loss assumed by the public investor shall be capped at 25 % of the total investment;

(d)

In the case of guarantees, the guarantee rate shall be limited to 80 % and total losses assumed by a Member State shall be capped at 25 % of the underlying guaranteed portfolio. Only guarantees covering the expected losses of the underlying guaranteed portfolio can be provided for free. If a guarantee also comprises coverage of unexpected losses, the financial intermediary shall pay, for the part of the guarantee covering unexpected losses, a market-conform guarantee premium;

(e)

The investors shall be allowed to be represented in the governance bodies of the energy efficiency fund or financial intermediary, such as the supervisory board or the advisory committee;

(f)

The energy efficiency fund or financial intermediary shall be established in accordance with the applicable laws and the Member State shall ensure a due diligence process in order to verify that commercially sound investment strategy will be applied for the purpose of implementing the energy efficiency aid measure.

9.

Financial intermediaries, including energy efficiency funds shall be managed on a commercial basis and shall ensure profit-driven financing decisions. This is considered to be the case when the financial intermediary and, as the case may be, the managers of the energy efficiency fund fulfil the following conditions:

(a)

they are obliged by law or contract to act with the diligence of a professional manager in good faith and avoiding conflicts of interest; best practices and regulatory supervision shall apply;

(b)

their remuneration conforms with market practices. This requirement is considered to be met where the manager is selected through an open, transparent and non-discriminatory call, based on objective criteria linked to experience, expertise and operational and financial capacity;

(c)

they shall receive a remuneration linked to performance, or shall share part of the investment risks by co-investing own resources so as to ensure that their interests are permanently aligned with the interests of the public investor;

(d)

they shall set out an investment strategy, criteria and the proposed timing of investments in energy efficiency projects, establishing the ex-ante financial viability and their expected impact on energy efficiency.

(e)

a clear and realistic exit strategy shall exist for the public funds invested in the energy efficiency fund or granted to the financial intermediary, allowing the market to finance energy efficiency projects when the market is ready to do so.

10.

Aid shall not be granted under this Article for investments undertaken to comply with Union standards that have been adopted and are in force.

11.

Aid may be granted under this Article for investments undertaken to comply with Union standards that have been adopted but are not yet in force. Where the relevant Union standards are minimum energy performance standards, the aid must be granted before the standards become mandatory for the undertaking concerned. In that case, the Member State must ensure that beneficiaries provide a precise renovation plan and timetable demonstrating that the aided renovation is at least sufficient to ensure compliance with the minimum energy performance standards. Where the relevant Union standards are different from minimum energy performance standards, the investment must be implemented and finalised at least 18 months before the standard enters into force.

12.

Aid may also be granted for the improvement of the energy efficiency of the heating or cooling equipment inside the building.

13.

Aid for the installation of energy equipment fired by fossil fuels, including natural gas, shall not be exempted under this Article from the notification requirement of Article 108(3) of the Treaty.

14.

The Member State may assign the implementation of the aid measure to an entrusted entity.