32 VII. COMMENTS FROM INTERESTED PARTIES › A. Corus, Decision_act (EU) 2005/137

In forcesince 15 Oct 2003

In the first place, Corus takes the view that Carsid is not competitive and will not be competitive in the future. According to Corus, Carsid has, because of its geographical location, a number of competitive disadvantages in terms of input costs: labour, coal price, iron ore price, scrap price and electricity price. Furthermore, its scale of operation is too small to allow it to benefit it from economies of scale [In the case of Carsid, raw materials have to be transhipped from deep-sea vessels to barges, then barged up the river and canal systems before being off-loaded to the works. This means double handling and extra freight costs. Since the production of a tonne of slab requires some 550 kg of coal and 1550 kg of iron ore, an extra EUR 5-10 per tonne on material costs adds between EUR 10 and EUR 20 per tonne to slab costs, i.e. 6 % to 12 %. On top of this, labour cost is higher in Belgium than in most parts of the EU, and labour productivity, in part due to the size of operation, is poor. This adds a further EUR 20 per tonne.]. Carsid has no offsetting competitive advantage to counteract those penalties: it will sell commodity products into an over-supplied market, while other producers are better placed for exports. Production costs at Charleroi are currently 15 % higher than an average competitor. Charleroi, with a cost of USD 219 per tonne, is the highest-cost producer in Europe (with the exception of the small Greek producer Halyvourgiki). It is placed at number 207 out of 300 producers analysed by World Steel Dynamics.