3. DESCRIPTION OF THE REQUESTED DEROGATION › 3.3. Report accompanying the requested derogation › 3.3.4. Plan to transition away from the participation of capacity emitting more than the emissions limit in capacity mechanisms, Decision_act (EU) 2026/341

In forcesince 11 Aug 2025
(81)

In addition to the measures described in recital (76) above, Poland plans to continue to support the deployment of low-emission installations. The main support schemes are the following:

a scheme for the construction and operation of a new nuclear power plant of up to 3750 MW, which is scheduled to start operating in the second half of 2030s [State Aid SA.109707 (2024/C) (ex 2024/N) – Poland Aid measures for the first nuclear power plant in Poland.],

a scheme to support the deployment of 5100 MW total installed capacity of new high-efficiency cogeneration units by 2028, which will allow coal-based district heating boilers to be replaced with cogeneration units that mainly use natural gas [State Aid SA.51192 (2019/N) – Poland – CHP support and State aid; SA.52530 (2019/N) – Poland – Reductions from CHP charges for Energy Intensive Users.],

renewable schemes to support, among other things, the installation of 3000 MW of onshore wind capacity, 9000 MW of solar energy (PV), 180 MW of hydroenergy, 300 MW of agricultural biogas, 660 MW of biomass and biogas installations (between 2022 and 2027) [State Aid SA.64713 (2021/N) – Poland – Prolongation of the support scheme for RES.], and up to 10,9 GW of offshore wind (between 2025 and 2028) [State Aid SA.55940 (2021/N) – Poland Offshore Wind scheme.],

about 3100 GW of biomethane per year, which will entail the construction of about 50 installations for a plant of an average size of 2,8 MW of energy converted to electricity equivalent [The proposed solutions will be subject to State aid approval by the Commission.].