Poland clarifies that these parameters reflect the purpose of the supplementary auctions, namely to procure the missing capacity, rather than contracting the same capacity that was already secured in previous auctions for the same delivery period for the second time. Otherwise, the maximum entry capacity value would be exceeded, and the volume offered for cross-border participation would be greater than that which can contribute to the adequacy of the Polish electricity system.