Therefore, the contract length and the duration of the delivery period are in line with the requirements set out in Article 64(2c), point (c) of the Electricity Regulation.
161 5. ASSESSMENT OF THE REQUESTED DEROGATION › 5.3. Article 64(2c) of the Electricity Regulation › 5.3.3. Article 64(2c) point (c): Supplementary auctions › 5.3.3.3. Contract length and duration of the delivery period, Decision_act (EU) 2026/341
In forcesince 11 Aug 2025