As the maximum entry capacity available for foreign capacity participation provides an estimate of the extent to which foreign capacity can contribute to generation adequacy in situations of system stress, the same capacity must not be allocated twice for the same delivery period through the primary and supplementary auction processes.
155 5. ASSESSMENT OF THE REQUESTED DEROGATION › 5.3. Article 64(2c) of the Electricity Regulation › 5.3.3. Article 64(2c) point (c): Supplementary auctions › 5.3.3.1. Eligibility criteria, Decision_act (EU) 2026/341
In forcesince 11 Aug 2025