Article 22(1), points (g) and (h) respectively of the Electricity Regulation, provide that the technical conditions for the participation of capacity providers must be set out in advance of the selection process and that the capacity mechanism must be open to participation of all resources that are capable of providing the required technical performance, including energy storage and demand-side management. The pre-qualification requirements for competitive bidding processes carried out after 31 December 2019 were set out in advance of the selection process (see recital (11)), and the processes were open to the participation of existing and new generators, demand response and storage operators located in Poland and to foreign capacity (see recital (10)). Moreover, the eligibility rules (see recital (10)), lead times (see recital (12)) and contract lengths (see recitals (15), (16) and (18)) take into account the specificities of potential capacity providers to ensure a level playing field between different technologies and between new and existing capacities.
109 5. ASSESSMENT OF THE REQUESTED DEROGATION › 5.3. Article 64(2c) of the Electricity Regulation › 5.3.1. Article 64(2c) point (a): Primary auction processes (main and additional auctions) › Compliance of primary auctions with Article 22 of the Electricity Regulation, Decision_act (EU) 2026/341
In forcesince 11 Aug 2025