2. FINDINGS CONCERNING BELGIUM, FRANCE, GERMANY, LUXEMBOURG AND THE NETHERLANDS › Assessment of the cost-efficiency targets [The cost-efficiency performance targets for the en route charging zone of France, included in the draft FABEC performance plan, were found by the Commission to be consistent with the corresponding Union-wide performance targets for RP4. Therefore, no related findings are set out in this Decision.] › En route charging zone of the Netherlands, Decision_act (EU) 2025/1040

In forcesince 16 May 2025
(41)

In respect of the criterion set out in point 1.4(d)(i) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission notes that the Netherlands refers in the draft FABEC performance plan to the additional determined costs incurred over RP4 by the ANSPs LVNL and MUAC in relation to measures needed for the achievement of the local capacity targets (‘capacity measures’). The presented capacity measures comprise the following main elements:

(a)

the training and recruitment by LVNL and MUAC of new ATCOs, mainly to replace the ATCOs expected to retire during RP4, but also to accommodate the forecasted the traffic growth and support system modernisation;

(b)

the improvement by LVNL of its ATCO training facilities and simulators, in order to increase training capacity and output;

(c)

the upgrade by LVNL of its ATM system, which is foreseen to enable future improvements in airspace capacity;

(d)

the development and implementation by MUAC of new tools and functions to support operations;

(e)

the implementation by MUAC of structural improvements in airspace design and use;

(f)

the construction by MUAC of a new building for the purpose of hosting a new operations room (OPS room) with supporting offices and facilities.