In respect of the criterion set out in point 1.4(d)(i) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission notes that Germany refers in the draft FABEC performance plan to the additional determined costs incurred over RP4 by the ANSPs DFS and MUAC in relation to measures needed for the achievement of the local capacity targets (‘capacity measures’). The presented capacity measures comprise the following main elements:
the training and recruitment by DFS and MUAC of new ATCOs: in the case of DFS, that measure is planned to result over RP4 into an overall increase of over 10 % of the number of ATCOs in operations at the area control centres (‘ACCs’) of Bremen, Karlsruhe, Langen and Munich, in order to address the capacity shortages faced by those ACCs; for MUAC, the number of ATCOs in operations is planned to only slightly increase over RP4 but the intake of new ATCOs will remain significant in order to make up for the expected high number of ATCO retirements over that reference period;
the acquisition and deployment by DFS of new ATM system functionalities for the ACC of Bremen and Munich; those functionalities are expected to result in operational improvements in the provision of ANS, including enhanced airspace capacity;
the initiative by MUAC and DFS, in respect of the ACC of Karlsruhe, to set up two geo-redundant data centres capable of supporting and replacing each other, with the objective of strengthening the service quality of air navigation services;
the participation of DFS, together with six other ANSPs, in a cooperation programme aiming at the development of a common future ATM system for the ANSPs concerned; DFS considers that the resulting new ATM system could be deployed at the ACC of Langen, not earlier than 2031, thus not within the timeframe of RP4;
the deployment by DFS of the technical systems and software necessary to comply with the sub-functionality ‘AF6 – Initial Trajectory Information Sharing’ required under Commission Implementing Regulation (EU) 2021/116 [Commission Implementing Regulation (EU) 2021/116 of 1 February 2021 on the establishment of the Common Project One supporting the implementation of the European Air Traffic Management Master Plan provided for in Regulation (EC) No 550/2004 of the European Parliament and of the Council, amending Commission Implementing Regulation (EU) No 409/2013 and repealing Commission Implementing Regulation (EU) No 716/2014 (OJ L 36, 2.2.2021, p. 10, ELI: http://data.europa.eu/eli/reg_impl/2021/116/oj).];
the implementation by DFS of changes in its surveillance system and of a new tool supporting a more efficient and dynamic sectorisation of airspace;
the development and implementation by MUAC of new tools and functions to support operations;
the implementation by MUAC of structural improvements in airspace design and use;
the construction by MUAC of a new building for the purpose of hosting a new operations room (OPS room) with supporting offices and facilities.