A period of eighteen months between the dates of entry into force and application of this Regulation aims to give sufficient time to Member States to ensure their national legislation does not contain any obstacles to the uniform and effective application of this Regulation. By way of derogation from that date of application, to ensure Member States have sufficient time to put in place new systems and comply with new rules introduced by this Regulation, some rules on transparency on existing physical infrastructure and planned civil works, on the digitalisation of single information points and on their role with regard to streamlining permit-granting procedures, as well as on in-building physical infrastructure, should apply at a later stage. For example, the obligation to equip new and majorly renovated buildings with fibre-ready in-building physical infrastructure and in-building fibre wiring should become mandatory 21 months after the date of entry into force of this Regulation and public sector bodies should make available information on existing physical infrastructure via the single information point in electronic form after 24 months after the date of entry into force of this Regulation, whereas the same obligation should continue to apply to network operators as already applied in accordance with Directive 2014/61/EU. Furthermore, while the transparency provisions concerning the minimum information on planned civil works, including the georeferenced location, need a longer period of up to 24 months after the date of entry into force of this Regulation, to allow Member States to ensure that the relevant single information points make available the appropriate digital tools, the existing single information points will continue to be used pursuant to Article 6(1), (2) and (3) of the Directive 2014/61/EU. The same applies to the relevant exceptions defined in Member States pursuant to Article 6(5) of the Directive 2014/61/EU. Member States are to withdraw national provisions overlapping with this Regulation or contradicting it by the time each provision starts to apply. As regards adopting new legislation during this period, it follows from Article 4(3) TEU that Member States have a duty of sincere cooperation not to take action that would conflict with prospective Union legal rules.
Recital 74, Regulation (EU) 2024/1309
In forcesince 29 Apr 2024
- celex=32014L0061
- num:eu=2014/61