Undertakings providing, or authorised to provide, public electronic communications networks deploying gigabit networks in a specific area could achieve significant economies of scale if they could terminate their network at the access point by using existing physical infrastructure and restoring the affected area. This should be possible irrespective of whether a subscriber has expressed interest for the service at that moment in time and provided that the impact on private property is minimised, without undue interference with the right to property. Once the network is terminated at the access point, the connection of an additional customer is possible at a significantly lower cost, in particular by means of access to a fibre-ready vertical segment inside the building, where it already exists. That objective is also fulfilled where the building itself is already equipped with a gigabit network to which access is provided to any public communications network provider which has an active subscriber in the building under transparent, proportionate and non-discriminatory terms and conditions. That could in particular be the case in Member States that have taken measures pursuant to Article 44 of Directive (EU) 2018/1972. The undertakings providing, or authorised to provide, public electronic communications networks should, to the extent possible, remove the elements of their network, such as obsolete cables, equipment, and restore the affected area upon termination of the contract with the subscriber.
Recital 53, Regulation (EU) 2024/1309
In forcesince 29 Apr 2024