Achieving the targets set out in Decision (EU) 2022/2481 requires that, by 2030, all end users at fixed locations be covered by a gigabit network up to the network termination point and all populated areas be covered by next-generation wireless high-speed networks with performance at least equivalent to that of 5G, in accordance with the principle of technological neutrality. Providing gigabit networks up to the end user should be facilitated, in particular through fibre-ready in-building physical infrastructure. Providing for mini-ducts during the construction of a building has only a limited incremental cost, while equipping buildings with gigabit infrastructure may represent a significant part of the cost of deploying a gigabit network. Therefore, all new buildings or buildings subject to major renovation works should be equipped with physical infrastructure and in-building fibre wiring, enabling the connection of end users to gigabit speeds, if it does not disproportionately increase the costs of the renovation works and if it is technically feasible. New multi-dwelling buildings and multi-dwelling buildings subject to major renovation works should also be equipped with an access point, easily accessible to one or more undertakings providing, or authorised to provide, public electronic communications networks, if it does not disproportionately increase the costs of the renovation works and if it is technically feasible. Moreover, building developers should provide for empty ducts from every dwelling to the access point, located in or outside a multi-dwelling building, allowing connections up to the network termination points, or in those Member States where the network termination point is placed, in accordance with national law, outside the end-user’s particular location, up to the physical point where the end-user connects to the public network. Major renovations of existing buildings at the end user’s location to enhance energy performance pursuant to Directive 2010/31/EU of the European Parliament and of the Council [Directive 2010/31/EU of the European Parliament and of the Council of 19 May 2010 on the energy performance of buildings (OJ L 153, 18.6.2010, p. 13).] provide an opportunity to also equip those buildings with fibre-ready in-building physical infrastructure, in-building fibre wiring and, for multi-dwelling buildings, an access point.
Recital 48, Regulation (EU) 2024/1309
In forcesince 29 Apr 2024
- celex=31931L2010
- celex=32010L0031