Recital 50, Regulation (EU) 2024/1309

In forcesince 29 Apr 2024

The provisions regarding fibre-ready in-building physical infrastructure, access point and in-building fibre wiring do not preclude the presence of other type of technology within the same in-building physical infrastructure. These provisions should not affect the right of building owners to equip the building with in-building wiring in addition to fibre, with additional in-building physical infrastructure capable of hosting wiring in addition to fibre or other elements of electronic communications networks.