In order to contribute to ensuring the availability of gigabit networks to end users, new buildings and majorly renovated buildings should be equipped with fibre-ready in-building physical infrastructure, in-building fibre wiring and, in the case of multi-dwelling buildings, an access point. Member States should have a degree of flexibility to achieve this. This Regulation, therefore, does not seek to harmonise rules on related costs, including the recovery of costs of equipping buildings with fibre-ready in-building physical infrastructure, in-building fibre wiring and an access point.
Recital 54, Regulation (EU) 2024/1309
In forcesince 29 Apr 2024