Recital 54, Regulation (EU) 2024/1309

In forcesince 29 Apr 2024

In order to contribute to ensuring the availability of gigabit networks to end users, new buildings and majorly renovated buildings should be equipped with fibre-ready in-building physical infrastructure, in-building fibre wiring and, in the case of multi-dwelling buildings, an access point. Member States should have a degree of flexibility to achieve this. This Regulation, therefore, does not seek to harmonise rules on related costs, including the recovery of costs of equipping buildings with fibre-ready in-building physical infrastructure, in-building fibre wiring and an access point.