5. ASSESSMENT OF THE AID › 5.1. EXISTENCE OF STATE AID › 5.1.1. MEASURE 1: REDUCED LEVEL OF THE FINANCIAL GUARANTEES › 5.1.1.1. Selective economic advantage › Evidence that Ibepotash's guarantee amounts are lower than required, Decision_act (EU) 2018/118

In forcesince 31 Aug 2017
(71)

The calculation of the expected costs is based on the analysis of the unit costs of the individual components of the covering for the waste heap resulting from a market research by the experts with suppliers of various works and supplies involved and using the 2012 pricing data published by the Catalan Institute of Technology and Construction (Institut de Tecnologia de la Construcció de Catalunya — ITeC). For comparison, the study also uses overall costs of restorations for different restoration options as estimated in the study prepared in 2001 by Symonds Group for DG Environment of the European Commission [A study of the costs of improving management of mine waste, Symonds Group in association with COWI, report to DG Environment, European Commission, final report October 2001.]. It also includes the costs of maintenance and control of the covered heaps for additional 10 years after the finalisation of the covering. These unit costs are then applied to the estimated amount of the waste material on the heaps in three different moments in time: (i) actual amounts in 2012, (ii) amounts expected in 2015 (year of the expected start of the production of salt from the waste material in a new plant in Suria), and (iii) amounts expected in 2035 (when the mining activities of Iberpotash are planned to be stopped). The resulting total costs of restoration in these periods are summarised in the following table:

Table 2

Estimated restoration costs according to the ERF Study

Year | Estimated restoration costs (EUR million)

Suria | Balsareny/Sallent | Total

2012 | 24,8 | 46,2 | 71,0

2015 | 26,9 | 52,3 | 79,2

2035 | 38,2 | 83,8 | 122,0