79 5. ASSESSMENT OF THE AID › 5.1. EXISTENCE OF STATE AID › 5.1.1. MEASURE 1: REDUCED LEVEL OF THE FINANCIAL GUARANTEES › 5.1.1.1. Selective economic advantage › Evidence that Ibepotash's guarantee amounts are lower than required, Decision_act (EU) 2018/118

In forcesince 31 Aug 2017

However, as explained above, the compliance with the criteria under the national law was clearly not confirmed by the court judgment. In addition, the measures contained in the restoration plan and taken into account in the study submitted by Iberpotash were limited to building perimetric canals, basins for the rain brine collected and similar measures aimed at limiting pollution, but clearly not leading to a permanent restoration of the waste heaps. The study does therefore not include nor quantify proper restoration measures for the calculation of expected costs. Since the expected actual costs of restoration are relevant for the calculation of the financial guarantee both under the Catalan (see recital 75 above) and under the Union legislation, the conclusions of the study provided by Iberpotash cannot serve as a basis for calculating the full and correct amount of the guarantees. As shown not only by the ERF Study but also by examples of similar waste heaps in France or Germany [See e.g. Annual Report of the German potash mining company K+S Kali GmbH for 2015, page 48 (http://www.k-plus-s.com/en/archiv/finanzberichte.html), the restoration methods used for Alsatian waste heaps as described in the ACA document provided as Annex 2 to the submission of the Spanish authorities of 19 April 2016 or a book by a German expert Henry Rauche: Die Kaliindustrie im 21. Jahrhundert, Springer-Verlag Berlin Heidelberg 2015, https://mining-report.de/blog/henry-rauche-die-kaliindustrie-im-21-jahrhundert/], such restoration normally involves either (a) total removal of the heaps (e.g. by backfilling of the material underground), (b) gradual desalinisation of the heaps by pumping water into the heap and collecting the resulting brine, or (c) permanent covering of the heaps. These proper restoration measures are, however, significantly more expensive than building perimetric canals, basins for the rain brine collected and similar measures aimed solely at limiting pollution. This is also demonstrated by the costs of covering of the Vilafruns dump that amounted to EUR 7,9 million (not including the annual maintenance costs). Considering that Vilafruns with around 3 million tonnes of salt material is a small heap compared to the active Cogulló heap (Balsareny/Salent) with 41 million tonnes or Fusteret heap (Suria) with 22 million tonnes, the total costs of restoring these active mines and covering the corresponding waste heaps are likely to be significantly higher than the costs for Vilafruns.