5. ASSESSMENT OF THE AID › 5.1. EXISTENCE OF STATE AID › 5.1.1. MEASURE 1: REDUCED LEVEL OF THE FINANCIAL GUARANTEES › 5.1.1.1. Selective economic advantage › Evidence that Ibepotash's guarantee amounts are lower than required, Decision_act (EU) 2018/118

In forcesince 31 Aug 2017
(69)

Based on available information, the ERF Study estimates the following evolution of the volume of waste accumulated on waste heaps in Suria and Sallent till the end of the mining activities in 2035:

Table 1

Estimated accumulation of the waste on the heaps in Suria and Sallent

Volume in 2012

(in kt)

Net annual increase of the volume (in kt/year) |

Volume in 2035

(in kt)

Sallent | 41000 | 1454 | 74531

Suria | 22000 | 525 | 33895