The Commission agrees with the ERF Study that the Plan Phoenix as such cannot be considered as a restoration measure and would in fact not stop the growth of the waste deposits during the operation of the mines. However, the Commission also recognises the claims of Iberpotash and the Spanish authorities that the plan does have an impact on the total expected restoration costs. The ERF Study does not take into account the fact that the salt processing and sales are likely to continue also once the potash mining activities are stopped. The Plan Phoenix is thus likely to gradually contribute to elimination of the waste heaps in the future and as such can be taken into account for setting the appropriate level of the guarantees as has been the case for the increased levels of guarantees proposed in 2015 and, at least for Balsareny/Sallent, confirmed by the national court.
115 5. ASSESSMENT OF THE AID › 5.1. EXISTENCE OF STATE AID › 5.1.1. MEASURE 1: REDUCED LEVEL OF THE FINANCIAL GUARANTEES › 5.1.1.5. Quantification of the aid, Decision_act (EU) 2018/118
In forcesince 31 Aug 2017